Laserfiche WebLink
REVISIONS <br /> ELECTRICAL SPECIFICATIONS <br /> I. GENERAL REQUIREM F..NTS <br /> A. All electrical work and materials shall be in full accordance with the latest rules and regulations of the <br /> Callfomia Administrative code title 24. PART li 'Basic Regulations". The national electric code and applicable <br /> state and/or local laws and reguLuions. Nothing in these plans or specifications shall be construed to permit work <br /> woo <br /> not conforming to the most stringent of these codes. Should any changes be necessary in the drawings or -. <br /> specifications to make this work comply with these requirements, the contractor shall price contractor at once in <br /> writing and cease work on pans of the contract that are affected. <br /> B. The drawings indicate diagrammatically the desired locations or arrangements of the conduit runs, outlets, <br /> equipment, etc. and shall be followed in executing the work so as to secure the best possible installation in the NV available space and to overcome local difficulties due to space limitations or interference due to structuralconditions encountered. LL <br /> C. In the event changes in the indicated locations or arrangements arc necessary due to developed conditions in the construction or rem mngament of furnishings or equipment, such changes shall be made without extra cost, r• soproviding the change is ordered prior to conduitruns, etc. and work directly connected to same is installed and no LJ extra materials are required. ' j co oMAIN C) toD. Coordinate and operate in every way with other trades in order to avoid interference and to assure a satisfactory ELECTRICALjob. PANEL TRUCK Z <br /> TRUCK MAINTENANCE BUILDING REPAIR ❑E. The contractor shall verify dimensionsofequipment mod be satisfied as to fit and that they comply with all code AREArequirements relating to clear working space'bout electrical equipment priorto purchasing equipment. LW � tc <br /> F. Submit material list to the prime contractor for approval within 14 days of award of contract. The right is reserved to require submission of samples of any materials whether or not particularly mentioned herein. > ec� Q et z <br /> G. Any materials and/or equipment alternates shall be submitted for approval in writing prior to award of contract. NzThe contractor shall provide all pertinent material forapproval along with samples of specified and intended �/ � � Xsubstitutions. Any materials and/or equipment installed by contractor as alternates without the above mentioned (N) ONIT 2-ROOT W approvals shall be removed and replaced at the contractors expense. MONITORING NG Yral <br /> SYSTEM + N <br /> so <br /> a <br /> H. Before final acceptance of work the contrctor is to insure that all equipment, systems, fixtures, etc. are working <br /> satisfactorily, without defect, to the letter and intent of the drawings, v 3 <br /> G <br /> rounding O <br /> L Contractor shall provide complete code approved grounding system including grounding electrodes, . e <br /> electrode conductors, bonding conductors and equipment grounding conductors as required by article 250, national <br /> electric code. <br /> J. Make good contact at panel boxes,outlet boxes and junction boxes to the conduit system. Equipment including m <br /> switchboards, transformers, conduit systems motors and other apparatus shall be grounded by a conductor to the <br /> i <br /> G <br /> ,,round. <br /> 11. Contractor shall be responsible for obtaining and paying forall required permits, inspections and examinations. <br /> 10 <br /> 1. All materials shall be new., conforming with the NEC,NFMA, NBFU and shall be UL listed. <br /> J. Rigid metallic conduit shall be UL listed, zinc coated exterior with zinc or en'mel interior and shall be used when <br /> installed underground in or under concrete slabs, in contact with the earth under public roadways, in masonry walls <br /> or exposed on building exterior. Provide 3" concrete encasement on all rigid metallic conduit underground. v 1 N <br /> K. All junction boxes at fuel ranks shall be of the ,explosion proof' type. Connections to the fuel pumps shall be <br /> installed in accordance with the N.E.C. Article 514. Explosion proof unions ,aid seals shall be install where Q (vr♦' :5 <br /> required by code. All conduits only shall be equipped with pull ropes. <br /> EXISTING UST#2 ll <br /> L. Conductors shall be copper, stranded, 600 volt rated insulation type HHN/fHWN for AWG size 4 and smaller. ANNULAR <br /> Size 3 and larger may be type THW. Use minimum size of#12 unless otherwise noted. PROBE z <br /> Boz <br /> 4 <br /> U <br /> J � H o <br /> A/C w a ' <br /> a � z <br /> CERTIFIED GROCERS STOCKTON FACILITY <br /> T�1oU <br /> Equipment upgrades O 0 1 O[� <br /> _. .._-_... _— / C� Z <br /> SPFC'S/YOTE.9 • • • r--I <br /> CLAN, DESCRIPTION OF ITEIAI � z <br /> i 2 Fiberglass kit <br /> 2 48" x 42" Fiberglass Riser, w/ 12" high opening &lid <br /> I Watertieht manhole, w/gasket& secured lid,5 gal. 36',centered t • • • ' <br /> I Waterligla manhole,w/gasket& secured lid 36" <br /> I Watertight manhole, w/gasket& secured lid I8" (N) FUEL TANKER _ <br /> PARKING AREA <br /> SUBMERSIBLE TURBINE PULIP A/C <br /> I Submersible pump: big flow <br /> 5 HP <br /> I Submersible pump 1.5 HP Reuse existing <br /> J <br /> J <br /> I Liquid Control Meter Liquid Control <br /> J <br /> Magnetic starter <br /> Mechanical leak detector rriyJl 3 <br /> DISPF`7 SER HARDWARE x m ONCRETE W <br /> 1 Dispenser- Commerical Rcuseexisting <br /> 1 Heavy Jury, highllow,automatic nuzzle Reuse existing SLAB `.!f 1 O 0 <br /> I 1 IN" x 15' hose Reuse existing • • ��// <br /> I 1 I/4" ewircl Reuse existing <br /> n liO W U b <br /> • • <br /> I High voltaic - spin otter and adapter 30 migron Reuss existing <br /> I Dispenser containment box w/2" impact valve Retrofit [� rF� 1--1 <br /> I Huse retractor Reuseexisting o • LJ ^ <br /> u <br /> I Island Form \ DISIENSER/ C <br /> O 5 <br /> FII L POR"1' 19.AND W <br /> I 4" Overfill prevention valve <br /> 1 4" Bronze till adapter O W J <br /> L <br /> I 4" FIII cap <br /> 1 4" FIII Tube 10' t <br /> 2 4" x 4" x 2" rent v;dve extractor Idling 1 �/ <br /> I 2" Float- vent valve <br /> J <br /> I ,.. velior& sem cap <br /> i ..... ................... ` NO SCALE U - <br /> MISCr <br /> 2 2' ,x 24' Plcx Connectors(MxF) <br /> 1 3" Connectors and (sump)containment bouts <br /> 1 a" Cummcton and (sump) containment boots <br /> I /TEn)ergency Shut-off val,c <br /> 2" check valve (anti-siphon) <br /> 1 1/2" Jouble poppet foot valve <br /> I Extractor Fool Valve fillings tx4x2x2 <br /> PROJECT NO. 1081 <br /> xl0.',1TORI,NG EOUL <br /> IEMrT <br /> I TL>V Leak detection console w/printer Vecdcr Root TLS350 <br /> 1 4 input probe module I SCALE: <br /> m <br /> 8 input liquid sensor odule <br /> I Annular(interstitial)proles <br /> I I' Annular cap and ring kit <br /> 2 T.mk sump sensors (probes) AUGUST 10, 1997 <br /> I 4" M tomt.,loctice 0.1 GPH ink level probe Ill' <br /> 1 4' Magnemstrictke probe(Diesel inxtallmiun kit <br /> 1 4" i ank Icccl - cap:nd ring kit <br /> I Spucm Mart up -__ - <br /> - - - E- 1 <br />