My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1987-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PINE
>
0
>
2300 - Underground Storage Tank Program
>
PR0503303
>
COMPLIANCE INFO 1987-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:16 AM
Creation date
11/6/2018 10:46:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-2003
RECORD_ID
PR0503303
PE
2381
FACILITY_ID
FA0005775
FACILITY_NAME
SOUTHERN PACIFIC TRANSPORTATIO
STREET_NUMBER
0
Direction
E
STREET_NAME
PINE
STREET_TYPE
ST
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
E PINE ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PINE\0\PR0503303\COMPLIANCE INFO 1987-2003.PDF
QuestysFileName
COMPLIANCE INFO 1987-2003
QuestysRecordDate
8/22/2017 11:15:12 PM
QuestysRecordID
3602111
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase II Hazardous Materials Study for the Lodi Rail/Multimodal Station July 24, 1997 <br /> to Wilbur Smith Associates Project No. E168 <br /> ' We do not recommend further exploration or analysis; however, this assumes that the risks stated <br /> above are acceptable. It should be noted that although efforts were made to identify areas within the <br /> ' site with potential hazardous materials and/or petroleum hydrocarbon issues,this does not completely <br /> eliminate the possibility of such issues existing within the site. <br /> ' LIMITATIONS <br /> Our findings and opinions are based on information that we obtained on given dates, through records <br /> ' review, site review, exploration, and related activities. It is possible that other information exists or <br /> subsequently has become known, just as it is possible for conditions we have observed to have <br /> changed after our observation. For these and associated reasons,Espana Geotechnical Consulting and <br /> ' many of its peers routinely advise clients for Site Assessment services that it would be a mistake to <br /> place unmerited faith in findings and opinions conveyed via a Site Assessment report. <br /> Site assessment activities were performed, our findings obtained, and our recommendations prepared <br /> in accordance with generally accepted principles and practices. We cannot under any circumstances <br /> warrant or guarantee that not finding indicators of hazardous materials means that hazardous materials <br /> ' do not exist on the site. Additional research and exploration can reduce the risks, but no techniques <br /> now commonly employed can eliminate these risks altogether. <br /> ' This report represents EGC's professional interpretation and judgement based on information gathered <br /> during investigative activities. Professional judgements expressed herein are restricted to facts <br /> available within the established limits of the scope of work, budget, and schedule. EGC assumes no <br /> responsibility for the existence or disclosure of conditions which did not come to its knowledge, or <br /> conditions not generally recognized as environmentally unacceptable at the time this report was <br /> prepared. <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> ' 10 <br /> ' V ESPANA GEOTECHNICAL CONSULTING <br />
The URL can be used to link to this page
Your browser does not support the video tag.