Laserfiche WebLink
Trench No . 7 ESPANA <br /> f LOG OF TRENCHTl e Geotechnical <br /> Consulting <br /> Project: Lodi Rail/Multimodal Station Project No.: E168-1 <br /> Elevation: 52.0 ft Date: October 24, 1996 <br /> Trenching Method: John Deere 410D Backhoe - 24 inch bucket Logged By: PFF <br /> Elevation/ Soil Symbols REMARKS Sample Density Moisture <br /> Depth Sampler Symbols USCS MATERIAL DESCRIPTION Number p.c.t. % <br /> and Field Test Data <br /> 52 7-0 Asphalt and gravel1.-6 inches Fill to a depth of 1.5 feet. <br /> ......... ...................................................... <br /> Light brown, damp, silty SAND with <br /> SM gravel. <br /> ..............::......... ...... ..................................................... <br /> Brown, damp, loose, silty SAND. <br /> 50 2 <br /> SM <br /> 48--4 <br /> 4a e <br /> 44--8 <br /> i <br /> 42—10 <br /> 40—12 <br /> i <br /> 38 14 <br /> Notes: <br /> iFigure I-13 <br /> 502 Giuseppe Court, Suite 11, Roseville, CA 95678 <br /> (916) 773-2600 FAX (916) 782-4846 <br />