Laserfiche WebLink
van-02--03 01 : 59P Wong Construct ion 209 547 9310 P .02 <br /> sMrr" SMnV FIBERGLASS PRODUCTS INC. <br /> I �r��rrrwrrwwwwwrarrrrr�� r�rrnonnrr��. <br /> 2700 WEST 657H STREET,LITTLE ROCK,AS 72208-8681•601-58x-4010 <br /> A SUBSCJtAr Cf n 0 5MIFP, COPPOHANON <br /> CERTIFICATIONI OF ATTENDANCE <br /> This is to certify that on February 4, 1992 _ the following <br /> employees ofWendt QRa§ rUctrion <br /> attended a seminar detailing the proper procedures to be used schen <br /> installing Smith Fiberglass Products' UL/ULC listed fiberglass <br /> piping systems for use in conveying underground petroleum products. <br /> The piping installation procedures were directly in acccrdance with <br /> the following Smith Fiberglass Products instruction manuals. <br /> 1. Manual 82164 - "General Installation Instructions <br /> for UL Listed RED THREADe II <br /> Pipe and Fittings" (Part 1 & 2) <br /> 2. Manual F6600 - "Assembly and Operating Instructions <br /> for 1"-6" Field Tapering Tool" <br /> One copy of this certification is provided for each company parti- <br /> cipating. Please distribute copies to each attendee. The pc-r- <br /> sonnel attending were as follows: <br /> Ken Wendt <br /> Richard Ruiz <br /> George Raverez <br /> Ana--Cleto Ramerez <br /> Armando Machuca <br /> Executiv .. iPresident <br /> February 5 , 1992 <br /> Date <br />