My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1998-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PINE
>
1126
>
2300 - Underground Storage Tank Program
>
PR0231364
>
COMPLIANCE INFO 1998-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:17 AM
Creation date
11/6/2018 10:51:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2003
RECORD_ID
PR0231364
PE
2361
FACILITY_ID
FA0003771
FACILITY_NAME
E F KLUDT & SONS INC
STREET_NUMBER
1126
Direction
E
STREET_NAME
PINE
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04906022
CURRENT_STATUS
01
SITE_LOCATION
1126 E PINE ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PINE\1126\PR0231364\COMPLIANCE INFO 1998-2003.PDF
QuestysFileName
COMPLIANCE INFO 1998-2003
QuestysRecordDate
9/7/2017 9:00:20 PM
QuestysRecordID
3628601
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORM <br /> TANKS <br /> UNDERGROUND STORAGE TANKS - INSTALLATION <br /> CERTIFICATE OF COMPLIANCE (one pale ler umkl <br /> rmnr_ter� <br /> I.FACILITY IDENTIFICATION <br /> BUSIN FSS NAMI JS.h c as I ACIZ.rTY NAMI:o,I)BA bourn@ Burins.Asl <br /> E.F. KLUDT&SOUS, INC. <br /> ADDRESS IF-Inew use only) 476 <br /> 1126 E.PINE ST., LODI CA 95240 <br /> FACILITY IM I TANK ID H 4aa <br /> Tank No. 6-UG <br /> H.INSTALLATION <br /> (Check all that apply) <br /> 478 <br /> ZI The installer has been trained and certified by the tank and piping manufacturers. <br /> ❑ The installation has been inspected and certified by a registered professional engineer having education and experience 479 <br /> with underground storage tank installations. <br /> 490 <br /> pq The installation has been inspected and approved by the Uiufied Program Agency. <br /> 41 <br /> ® All work listed on the manufacturer's installation checklist has been completed. <br /> 483 <br /> ® The installer has been certified or licensed by the Contractors' State License Board. <br /> ® The underground storage tank,any primary piping,and secondary containment was installed according to applicable 483 <br /> voluntary consensus standards and written manufacturer's installation procedures- <br /> Description of work being certified: <br /> INSTALL NEW TANK TRIM AND UNDERGROUND PIPING. <br /> INSTALL NEW UNDER-DISPENSER CONTAINMENT&MONITORING SYSTEM. <br /> III. TANK OWNERJAGENT SIGNATURE <br /> I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> SIGN) TA REAGENT PATE / 484 <br /> Cp— <br /> 14. <br /> NAME OF TANK OWNER/AGENT(print) 485 TITLE;OF TANK OWNMAGENT 4M <br /> STEPHEN KLUDT PRESIDENT <br /> UPCF(1199 revised) 14 Formerly SViRCB Forth C <br />
The URL can be used to link to this page
Your browser does not support the video tag.