My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1987-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PORT
>
0
>
2300 - Underground Storage Tank Program
>
PR0502082
>
COMPLIANCE INFO 1987-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:16 AM
Creation date
11/6/2018 11:24:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-2007
RECORD_ID
PR0502082
PE
2381
FACILITY_ID
FA0005321
FACILITY_NAME
PORT OF STOCKTON
STREET_NUMBER
0
STREET_NAME
PORT
STREET_TYPE
RD
City
STOCKTON
Zip
95201
CURRENT_STATUS
02
SITE_LOCATION
PORT RD 21
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PORT\0\PR0502082\COMPLIANCE INFO 1987-2007.PDF
QuestysFileName
COMPLIANCE INFO 1987-2007
QuestysRecordDate
8/23/2017 3:09:04 PM
QuestysRecordID
3602370
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ALCOM EmeRGY <br /> — ASSOCIATES <br /> IN PARTNERSHIP WITH THE ENVIRONMENT <br /> February 21, 1991 <br /> Mr. Doug Wilson <br /> San Joaquin County <br /> Public Health Services <br /> Environmental Health Division <br /> Post Office Box 2009 <br /> 445 North San Joaquin Street <br /> Stockton, California 95201 <br /> RE: Closure of Underground Tank Excavations at Port Road 21 and M <br /> Dear Mr. Wilson: <br /> It has been over six weeks since I first contacted your office about <br /> getting authorization for closure of the excavations on the property that <br /> Falcon Energy Associates has leased from the Port of Stockton. These <br /> excavations are not only an inconvenience but a hazard and I do not feel that <br /> it is Falcon Energy Associates responsibility that these excavations are <br /> properly documented. Falcon took the iniative earlier to have the <br /> excavations and the soil piles sampled in order to speed closure of the <br /> site. <br /> I have spoken to you numerous times during which you expressed the intention <br /> to come out personally and review the site. As you have not made any indication <br /> that your arrival will be forthcoming, I am prepared to initiate closure of <br /> the excavations based on the sample analyses. In deference to your interest <br /> in the project, I am allowing six (6) working days for you to come inspect <br /> the site before proceeding with closure. I have enclosed copies of the <br /> laboratory results for your benefit. <br /> Sincerely, <br /> Patricia iesel <br /> Vice-President, General Manager <br /> Falcon Energy Associates <br /> PK/cm <br /> Enclosures <br /> P.O. Box 1257 • Stockton, California 95201 • Number One, Port Road 21, Port of Stockton Stockton, California 95203 <br /> (209)463-7108 • FAX (209) 463-2712 <br />
The URL can be used to link to this page
Your browser does not support the video tag.