My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 1985-1990
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SACRAMENTO
>
26720
>
2300 - Underground Storage Tank Program
>
PR0504171
>
BILLING 1985-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 10:52:20 PM
Creation date
11/6/2018 12:00:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
1985-1990
RECORD_ID
PR0504171
PE
2381
FACILITY_ID
FA0006103
FACILITY_NAME
HAROLD K PICKRELL
STREET_NUMBER
26720
STREET_NAME
SACRAMENTO
STREET_TYPE
BLVD
City
THORNTON
Zip
95686
CURRENT_STATUS
02
SITE_LOCATION
26720 SACRAMENTO BLVD.
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\S\SACRAMENTO\26720\PR0504171\BILLING 1985-1990.PDF
QuestysFileName
BILLING 1985-1990
QuestysRecordDate
8/3/2017 6:46:59 PM
QuestysRecordID
3552034
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIO WATER RESOURCESCONTROARD <br /> FORM V: UNDERGROUND STORAGE TANK PRO RAM n' <br /> TANK TANK PERMIT APPLICATION INFORMATION <br /> COMPLETE A SEPARATE FORM WITH THE FOLLOW!1N9 INFORMATION FOR EACH TANK. Z <br /> 10 <br /> MARK ONLY ❑ 1 NEW PERMIT F-13 RENEWAL PERMIT CHANGE OF INFORMATION ❑ ERMANENTLY CLOSE ANK <br /> ONE ITEM ❑2 INTERIM PERMIT F-14 AMENDED PERMIT ❑�69TEMPORARY TANK CLOSURE 8 TANK REMOVED N <br /> FACILITY/SITE NAME WHERE TANK IS INSTALLED: FARM TANK-YES❑ NO <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-IF UNKNOWN-SO SPECIFY <br /> Cf 1 <br /> A. OWNERS TANK IDH , B. MANUFACTURED BY: <br /> C. YEAR INSTALLED D. TANK CAPACITY IN GALLONS: O <br /> II. TANK ONTENTS IF(A.1),IS MARKED,COMPLETE ITEM C.IF(A.1),IS NOT MARKED,COMPLETE ITEM D. <br /> A. 1 MOTOR VEHICLE FUEL ❑ 2 PETROLEUM B. C. ❑ 1 UNLEADED ❑ 2 LEADED 3 DIESEL <br /> ❑3 CHEMICAL PRODUCT ❑ 4 OIL H t PRODUCT ❑ 4 GASAHOL ❑5 JET FUEL ❑6 AVIATION GAS <br /> ❑5 HAZARDOUS ❑BO EMPTY ❑95 UNKNOWN ❑ 2 WASTE ❑7 METHANOL ❑ 99 OTHER(DESCRIBE IN ITEM D,BELOW) <br /> D. IF NOT MOTOR VEHICLE FUEL,ENTER NAME OF <br /> HAZARDOUS SUBSTANCE STORED&C.A.S.H C.A.S.H: A <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOX A,B,C,6 D <br /> A TYPE OF ❑ I DOUBLE WALLED ❑ 3 SINGLE WALLED WITH EXTERIOR LINEA ❑ 95 UNKNOWN <br /> SYSTEM 2 SINGLEWALLED ❑4 SECONDARY CONTAINMENT ❑99 OTHER <br /> 1 STEEL/IRON ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> B.TANK ❑5 CONCRETE E]6 POLYVINYLCHLORIDE F-17 ALUMINUM E]B 100%METHANOL COMPATIBLE FRP <br /> MATERIAL <br /> ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBEALINED ❑2 ALKYD UNING ❑3 EPDXY UNING ❑4 PHENOLIC UNING <br /> C. INTERIOR5 GLASS LINING IJNUNED ❑ 95 UNKNOWN <br /> LINING ❑ © <br /> F-1 IS LINING MATERIAL COMPATIBLE WITH 100%METHANOL7 ❑YES 0 N ❑99 OTHER I <br /> D.CORROSION ❑ i POLYETHLENE WRAP ❑ 2TAR OR ASPHALT ❑ 3'AWL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑5 CATHODIC PROTECTION ❑91 NONE La95 UNKNOWN ❑99 OTHER <br /> IV. PIPING INFORMA ON CIRCLE A IF ABOVE GROUND, U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A SYSTEM TYPE A SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 91 NONE A U 95 UNKNOWN A U 99 OTHER <br /> B.CONSTRUCTION A 1 SINGLE WALLED A U 2 DOUBLE WALLED A U 3 LINED TRENCH A U 91 NONE A U 95 UNKNOWN A U 99 OTHER <br /> U <br /> A�ll 1 STEEL/IRON A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC) A U 4 FIBERGLASS PIPE A U 91 NONE <br /> C.MATERIAL A U 5 ALUMINUM A8 CONCRETE A U ?STEEL CLAD WERE A U 8100%METHANOL COMPATIBLE FRP <br /> A U 9 GALVANIZED STEEL A U 95 UNKNOWN A U 99 OTHER <br /> V. LEAK DETECTION SYSTEM CIRCLE P FOR PRIMARY,OR S FOR SECONDARY,A PRIMARY LEAK DETECTION SYSTEM MUST BE CIRCLED. <br /> P 8 1 VISUAL CHECK P S 2 INVENTORY RECONCILIATION P t 8 3 VADOSE WELLS P 8 4 ELECTRONIC MONITOR P S 5 GROUND WATER MONITORING WELLS <br /> Na P S 6 PRECISION TESTING P S 7 PRESSURE TESTING ®91 NONE P S 95 UNKNOWN P S 99 OTHER <br /> VI. INFORMATION ON TANK PERMANENTLY CLOSED IN PLACE <br /> 1.ESTIMATED TE LAST USED(MO/YR) 2. ESTIMATED UANTITYOF 3.WAS TA "K�FF L'LED WITH <br /> SUB`,1TAI4 REMAINING IN INERY A IAL? ❑YES ❑ NO <br /> vV Vim\ GALLONS w <br /> THIS FO HAS BEEN COMPLETED UNDER PENALTY O PERJURY,AND TO THE BEST OF MY KNOWL DGE,IS TRUE AND CORRECT. <br /> APPLICANT'S NAME(PRINTED 8 SIGNATURE) DATE <br /> LOCAL AGENCY USE ONLY <br /> COUNTY H JURISDICTION H AGENCY H FACILITY ID H TANK ID H <br /> b 1 b D � p 1 <br /> CURRENT LOCAL AGENCY FACILITY ID H APPROVED BY NAME PHONE H WITH AREA CODE <br /> MAP <br /> PERMIT NUMBER PERMIT APPROVAL DATE PERMIT EX RATION DATE <br /> CHECK N PERMIT AMOUNT URCHARGE AMT. FEE CODE RECEIPT p BY: �^ <br /> FORM B(6-29-B6) THIS FORM MUST BE ACCOMPANIED BY A FACILITY/SITE APPLICATION, FORM 'A,UNLESS A CURRENT FORMA' HAS BEEN FILED �\ <br /> DATA PROCESSING COPY <br />
The URL can be used to link to this page
Your browser does not support the video tag.