My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010 REPAIR
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
345
>
2300 - Underground Storage Tank Program
>
PR0231867
>
COMPLIANCE INFO_2010 REPAIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 4:17:01 PM
Creation date
11/6/2018 12:09:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 REPAIR
RECORD_ID
PR0231867
PE
2361
FACILITY_ID
FA0003959
FACILITY_NAME
AT&T CALIFORNIA - UE042
STREET_NUMBER
345
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
345 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\S\SAN JOAQUIN\345\PR0231867\REPAIR PLAN 2010.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
No <br /> CO-FLEXIm DOABLE WALL PIPING SPECIFICATION <br /> Summary <br /> The Co-Flex Double Wall Piping System is to be installed for the purpose of product <br /> delivery and provides secondary containment for the product piping,In accordance <br /> with the manufacturer's installation Instructions. The Co-Flex Double Wall Piping System <br /> shall contain environmentally hazardous fluids that might leak from the product piping, <br /> provide fluid communication and shall include corrosion resistant fittings and couplings <br /> for connections within containment sumps located at the tanks and dispensing points. <br /> The Co-Flex Double.Wal Piping System shall be manufactured/supplied by Western <br /> Fiberglass,Inc. <br /> system SpecElcallons <br /> 1.01 System Suitability <br /> The Co-Flex Double Wall Piping-System shall: <br /> A. Provide secure,secondarily contained fuel transfer between storage and <br /> dispensing devices. <br /> B. - Be irnstoled within a Rockguard/Conduit system. <br /> C. Contain any release of environmental contaminates from the product i <br /> delivery section,primary pipe,contained within the Co-Flex System. <br /> D. Provide fittings,test points and connections as required to facilitate direct <br /> connection piping and monitoring of containment between product <br /> steroge and dispensing points. <br /> 1.02 Construction Specifications: <br /> A. Be constructed with a smooth seamless inner wall that is a specialized <br /> chemical and permeation resistant thermoplastic with the outer layer <br /> being a flexible thermoplastic tie. <br /> B. The reinforcement is a synthetic Polyester fiber applied in braided plies. <br /> C. The hose cover is a smooth,seamless sheath of fuel resistant material. <br /> D. Be constructed of materials that are not harmful to the environment. <br /> E. Be suitable for chemicals,food products,petroleum products and blends <br /> including methanol,ethyl alcohol,MTBE,ETBE and additives. <br /> F. Have a ten (10) year warranty against corrosion. <br /> Contact Us For More information! <br /> 1555 Copperhill Parkway a Santa Rosa, CA 95403 <br /> Ph: (800) 688-3375 or (707) 523-2050 <br /> www.westemfg.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.