My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010 REPAIR
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
345
>
2300 - Underground Storage Tank Program
>
PR0231867
>
COMPLIANCE INFO_2010 REPAIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 4:17:01 PM
Creation date
11/6/2018 12:09:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 REPAIR
RECORD_ID
PR0231867
PE
2361
FACILITY_ID
FA0003959
FACILITY_NAME
AT&T CALIFORNIA - UE042
STREET_NUMBER
345
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
345 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\S\SAN JOAQUIN\345\PR0231867\REPAIR PLAN 2010.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> Jeff Wong [EH] <br /> From: Jeff Wong [EH] <br /> Sent: Friday, February 19, 201010:26 AM <br /> To: 'Brown, Chris' <br /> Cc: SATRE, RODRICK(ATTSI); HARRELL, LARRY(ATTSI); NAUMANN, VYRL(ATTSI); is936g@att.com; Ric Collins; <br /> Delnagro, Rob <br /> Subject: RE:AT&T Facility(UE042); 345 N San Joaquin, Stockton-Piping modification/repair permit application <br /> Chris: <br /> Thanks for the email. The items of concern you've listed below are correct. As for the last item#4, in the original workplan (page <br /> 2)it was stated the vent/return piping will be replaced with new double wall FRP piping if it fails secondary re-test. In that <br /> case SJCEHD will condition (which will be stated in the final permit approval)inspection"during"the pipe removal, so we can <br /> observed that in real time as the piping comes out, whether if there is signs of contamination, and if so, sampling will be required. <br /> It's best that you include the ventlretrun piping in the sampling protocol as contingency based on field conditions. <br /> Also, please refrain from using languages such as "assume that no response means that you concur with the above". SJCEHD <br /> does not accept inspection scheduling, permit application, amendment or addendum to permit applicaiton by email. Any service <br /> request, amendment or addendum to permit application must be done in writing and in triplicates. <br /> Best Regards, <br /> Jeff <br /> From: Brown, Chris [mailto:Chris.Brown@stantec.com] <br /> Sent:Thursday, February 18, 2010 9:20 AM <br /> To:Jeff Wong [EH] <br /> Cc: SATRE, RODRICK(ATTSI); HARRELL, LARRY(ATTSI); NAUMANN, VYRL(ATTSI); ls936g@att.com; Ric Collins; <br /> Delnagro, Rob <br /> Subject: AT&T Facility(UE042); 345 N San Joaquin, Stockton - Pfping modification/repair permit application <br /> Hi Jeff, <br /> I apologize for the duplicate e-mail but I failed to request a delivery receipt for my records so I am sending this to you <br /> again. I'm following upon our telephone conversation from yesterday(2-17-10)to confirm the additional items you <br /> requested pertaining to the piping modifications permit submittal for the subject site. Below are the items you requested. <br /> Please confirm if these are all the items you need: <br /> 1) Revise language in sampling protocol prepared by Shaw Environmental to indicate exactly where the samples will <br /> be collected from (i.e. "1-2 feet beneath the piping"); <br /> 2) Revise language in sampling protocol prepared by Shaw Environmental to indicate that analytical results will be <br /> transmitted directly to the SJCEHD by McCampbell Analytical instead of Shaw transmitting the results via e-mail; <br /> 3) Provide 3 copies of all information submitted; <br /> 4) You will check with your supervisor and advise me if sampling will be required beneath the vent piping to be <br /> replaced. If it is required we will revise the sampling protocol accordingly. <br /> Please acknowledge and agree by responding to this e-mail; OR,AT&T will assume that no response means that you <br /> concur with the above. If I have missed any items please provide them in your response. Thanks. <br /> Chris Brown <br /> Project Manager <br /> Stantac <br /> 2/19/2410 <br />
The URL can be used to link to this page
Your browser does not support the video tag.