My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010 REPAIR
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
345
>
2300 - Underground Storage Tank Program
>
PR0231867
>
COMPLIANCE INFO_2010 REPAIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 4:17:01 PM
Creation date
11/6/2018 12:09:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 REPAIR
RECORD_ID
PR0231867
PE
2361
FACILITY_ID
FA0003959
FACILITY_NAME
AT&T CALIFORNIA - UE042
STREET_NUMBER
345
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
345 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\S\SAN JOAQUIN\345\PR0231867\REPAIR PLAN 2010.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jeff W EH <br /> From: Kasey Foley[EH] <br /> Seat: Tuesday, November 16, 2010 5:03 PM <br /> To: 'HARRELL, LARRY(ATTSI)';Jeff Wong [EH] <br /> Subject: RE: CUPA Permit Request UE042 <br /> Mr. Harrell, <br /> The letter from Jeff Wong says to"...comply with above request within 30 days of this letter"which would be December 10. <br /> I understand the box checked states"immediately"but the bottom of the letter clarifies within 30 days. <br /> Additionally, to quote your quote"...Settling Defendant shall file as promptly as reasonably practicable, but in no event later <br /> than 45 days after test failure(or no later than 60 days if engineering drawings are required, a complete application with <br /> the agency or agencies for a permit or other required regulatory authorization to undertake the repairs, and Settling <br /> Defendant shall complete the repair no later than 60 days after receipt of such permit or Other required authorizations <br /> ...(emphasis added)"looks to me like you aren't required to wait 45 days to submit a repair permit. <br /> We will be happy to accept a permit application sooner than the last day allowed in the judgment but we will not require an <br /> application for a permit be submitted before December 10, 2010. <br /> If I have misunderstood your concern, please contact me. I will be in the office Wednesday. <br /> Kasey Foley, REHS <br /> Program Coordinator <br /> San Joaquin County Environmental Health Department <br /> 600 East Main Street <br /> St Dckton, CA 95202-3029 <br /> (209)468-3451 <br /> Id @s hd.com <br /> --Original Message <br /> From: HARRELL, LARRY(ATTSI)fmailto:hh52590att.coml <br /> Sent:Tuesday, November 16, 2010 9:25 AM <br /> To: Kasey Foley[EH]; Jeff Wong[EH] <br /> Subject:CUPA Permit Request UE042 <br /> Importance: High <br /> Ms. Foley: <br /> I would appreciate it if you would examine the attached document from San Joaquin County found in the e-mail below. <br /> The request to immediately submit for a repair permit for failed equipment found during the SB989 testing conducted at <br /> 345 N.San Joaquin, Stockton, CA 95202 on 10/25/10 appears to be in conflict with Judgment Order#CV028367 issued by <br /> the State of California on January 13, 2006. 1 have attached the following link to that order from State Water Resources <br /> Control Board Web Page: <br /> http:/Avww.waterboards.ca.govtwater issuestproaramslenforcementtdocs/att <br /> _settlement.pdf <br /> Pursuant to this Consent Judgment, Section 6.3(page 12), "...Settling Defendant shall file as promptly as reasonably <br /> practicable, but in no event later than 45 days after test failure(or no later than 60 days if engineering drawings are <br /> required,a complete application with the agency or agencies for a permit or other required regulatory authorization to <br /> undertake the repairs, and Settling Defendant shall complete the repair no later than 60 days after receipt of such permit or <br /> other required authorizations ...(emphasis added). <br /> In light of the Consent Judgment,AT&T is respectfully requesting that we be allowed to observe the conditions of the <br /> Consent Judgment and submit a repair permit application no later than 12/9/2010 as we do not anticipate that engineering <br /> drawing are required for this repair. <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.