My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010 REPAIR
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
345
>
2300 - Underground Storage Tank Program
>
PR0231867
>
COMPLIANCE INFO_2010 REPAIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 4:17:01 PM
Creation date
11/6/2018 12:09:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 REPAIR
RECORD_ID
PR0231867
PE
2361
FACILITY_ID
FA0003959
FACILITY_NAME
AT&T CALIFORNIA - UE042
STREET_NUMBER
345
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
345 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\S\SAN JOAQUIN\345\PR0231867\REPAIR PLAN 2010.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 3 of 5 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed by ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used ®Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used:4"Liquid Gauge Equipment Resolution: .I <br /> Piping Run# Piping Run# Piping Run# Piping Run# <br /> UE042U001 Supply UE042UC01 Return UE042UO01 Vent <br /> Piping Material: Poly Poly Fiberglass <br /> Piping Manufacturer: Total containment Total Containment A.O.Smith <br /> Piping Diameter: 2" 2" 4" <br /> Length of Piping Run: Approx.25' Approx.25' Approx.25' <br /> Product Stored: Diesel Diesel Diesel <br /> Method and location of piping-run Test Boot Test Boot Test Boot <br /> isolation: <br /> Wait Time between applying 15 Min 15 Min Visual Fail <br /> pressure/vacuum/water and starting <br /> test: <br /> Test Start Time: 10:00 AM 10:00 AM <br /> Initial Reading(Ri): 5 PSI 5 PSI <br /> Test End Time: 11:00 AM 11:00 AM <br /> Final Reading(Rf): 5 PSI 5 PSI <br /> Test Duration: I Hour 1 Hour <br /> Change in Reading(Rf-Ri): 0 0 <br /> Pass/Fail Threshold or Criteria: 0 0 <br /> Test Result ® Pass ❑ Fail N Pass ❑ Fail ❑ Pass R Fail ❑ Pass ❑ Fail <br /> Comments include any information on repairs made prior to testing,and recommended folIDEjup for failed tests <br /> *Vent failure due to cracked test boot. <br />
The URL can be used to link to this page
Your browser does not support the video tag.