My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010 REPAIR
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
345
>
2300 - Underground Storage Tank Program
>
PR0231867
>
COMPLIANCE INFO_2010 REPAIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 4:17:01 PM
Creation date
11/6/2018 12:09:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 REPAIR
RECORD_ID
PR0231867
PE
2361
FACILITY_ID
FA0003959
FACILITY_NAME
AT&T CALIFORNIA - UE042
STREET_NUMBER
345
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
345 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\S\SAN JOAQUIN\345\PR0231867\REPAIR PLAN 2010.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> 1/ <br /> SAN JOAGtNN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street,Stockton,Califomis 95202-3029 <br /> Telephone:(209)468-3420 Fax:(209)46&3433 Web: <br /> CONTINUATION FORM Page: 3 of <br /> Date: 05/13/10 <br /> Facility Address: 345 N. San Joaquin, Stockton, CA Program: UST <br /> SUMMARY OF VIOLATIONS <br /> CLASS I CLASS 114 or WNOR-Nottw to Comply) <br /> This is a revised version of the Official Inspection Report of the Routine and Monitoring Certification <br /> inspection conducted on 511312010. Based on recently surfaced information (see Notes below), this <br /> revision removes Minor violations - Notice to Comply#5 and #33 cited on the original report. Therefore: <br /> No violation was observed during the referenced inspection on 5/1312010. <br /> NOTES (following are not violations) <br /> #5. EHD was informed on July 21, 2010, that the Veeder Root 208 liquid sensors in the supply line <br /> transition sumps were installed on May 7, 2010. Since the revised Monitoring Plan was submitted to <br /> EHD on May 14, 2010, the requirement of submitting a current Monitoring Plan to the local agency within <br /> 30 days of changes of information has been met. <br /> #33. Sheet F38 of the original blue print dated 9/21/2009 by Stantec submitted to EHD included <br /> installation of 208 sensors in the supply line transition sumps. The information was not initially listed on <br /> Page 2 of the application for UST retrofit or piping repair permit, which was approved by EHD on March <br /> 10, 2010. The information was subsequently added on Page 2 on May 13, 2010 and reapproved by <br /> EHD. EHD agrees that#33 is invalid in this case. However, for future service requests to EHD, detailed <br /> description of all proposed work, components to be repaired or replaced, and equipment to be used, <br /> must be made on Page 2. What's on Page 2 cannot be different from what's on the blue print. <br /> ALL 00 STAFF TM ASSOCIATED VON FA&M TO COMPLY MY TF1!ASOYE MOTED DATES MMLL.SE E ASO AT TILE Ci 4WR HOUIFLY RATE(=115). <br /> THIN FACILrrY IS SUBJECT TO REINSPECTION AT ANY TWE AT END'S CURRENT HOURLY RATE. <br /> EHD Received th Tilt: <br /> E 23-02 111D CONTINUATION FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.