Laserfiche WebLink
G.C. SHALL INSTALL A DEDICATED, <br />GENERAL NOTES <br />UNSWITCHED FOURPLEX OUTLET IN <br />WAREHOUSE EDP ROOM AND A <br />DEDICATED UNSWITCHED DUPLEX <br />NEW AT WAREHOUSE <br />EDP ROOM <br />k SEE CONDUIT - <br />INSTALLATION NOTES <br />SEE MATERIALS LIST (T-7) FOR SPECIFICATIONS ON EQUIPMENT <br />(- ) <br />OUTLET BY BURGLAR PANEL IN EDP <br />COSTCO <br />5 <br />USED IN THIS CONSTRUCTION. <br />V) <br />ROOM UNDER WAREHOUSE SCOPE <br />OF <br />137 11 <br />SEE CIVIL PLANS FOR ROUTING <br />2 <br />8 (44 #3/0 THWN C, U. <br />�2 <br />ROUTING SHOWN ARE SCHEMATIC, FINAL LOCATIONS SHALL BE <br />H m <br />WORK. (POWER FROM WAREHOUSE <br />BUILDING <br />INFORMATION <br />+" 1, <br />E-3 <br />( ) C.U. E.G. <br />SHOWN ON AS -BUILT DRAWINGS. <br />F - <br />O <br />FOR VIDEO SYSTEM) <br />591° <br />-- 581" <br />FUTURE DIAGNOSTIC 36 TANK MONITORING <br />FUTURE POWER/COMM 37 TANK MONITORING <br />14 <br />CONTROLLER <br />117 ENCLOSURE 3 17 PROPOSED TRANSFORMER <br />� <br />ALL EQUIPMENT SHALL BE INSTALLED AS PER MANUFACTURER'S <br />SPECIFICATIONS. <br /># <br />Z O <br />Q Z N <br />-— <br />NOT TO SCALE <br />38 TANK MONITORING <br />LOCATION <br />FUNCTIONS OF THE CONTINUOUS MONITORING: <br />-MONITORING OF ALL ANNULAR SPACE. <br />Q Q —j <br />U <br />- - <br />/ <br />—MONITORING1 LL FILL <br />p <br />Q <br />-PROVIDGPHAPRESSURECLINEPINGLEAR DDETECTIONU (PLLD) OF <br />Q i Z LL <br />(1)-3" UNDERGROUND ERGROUNDLL <br />( ) <br />PRODUCT LINES <br />J W � <br />p[ W <br />O O O <br />n r PVC CONDUIT (SCHEDULE <br />PROVIDE CONTINUOUS TANK LEVEL MONITORING. <br />n' � ® Z <br />U <br />i <br />_25 80) OR AS REQUIRED BY <br />-MONITORING OF ALL DISPENSER SUMPS. a <br />W Q U- J <br />o j ° <br />>) POWER COMPANY. <br />THE CONTINUOUS MONITORING DEVICE SHALL PROVIDE POSITIVE o <br />F_ - <br />= O <br />--- <br />O <br />• <br />i EMERGENCY <br />---VENT STACKS 16 110 <br />SHUT-OFF SWITCH <br />__. n O <br />SHUTDOWN OF TURBINES AND DISPENSERS AUTOMATICALLY IN <br />THE EVENT OF A LIQUID RELEASE AND MANUALLY THROUGH THE <br />Q <br />J W Q <br />O U <br />Q N <br />O <br />TANK RISER <br />200 ANAP, 3 -PH, 4W <br />5 13 METER & DISCONNECT <br />ESO SWITCH LOCATED ON THE CONTROLLER ENCLOSURE AND <br />REMOTE ESO SWITCH AS INDICATED ON SITE PLAN. <br />e <br />i� N � <br />O <br />GROUNDING 18 OVERFILL 115 116 <br />ALARM <br />ALL WIRES ENTERING CONTROL PANELS, MAIN PANELS, AND SUB <br />g <br />® <br />J V <br />(TYP. ALL TANKS) FILL FILL FILL <br />i <br />VEEDER ROOT <br />o 114 4 <br />PANELS SHALL BE MARKED WITH PHASE TAPEY <br />i— <br />{ 911 PHONE 123 <br />PANEL <br />CODING AS FOLLOWS: N <br />"A" PHASE = BLACK <br />1 Q <br />C <br />TANK #3 TANK #2 <br />139 CAMERA POWER <br />SUPPLY LOCATION <br />"B" PHASE = RED o <br />"C" PHASE BLUE <br />mT <br />W <br />SHEET INFORMATION NOTE: <br />UNLEADED UNLEADED f ;UNLEADED O <br />j PREMIUM REGULAR r REGULAR 1 _ <br />�� O <br />3 ,. <br />= <br />if I � B-5 <br />B 1 <br />[6] <br />ALL CONDUCTORS SHALL BE CONTINUOUS (WITH NO SPLICES) STRANDED <br />S <br />dj <br />BASE SHEET INFORMATION PROVIDED BY MULVANNYG2, <br /># ��, <br />O <br />COPPER WITH 75`C THWN INSULATION, OIL AND GAS RESISTANT. o <br />FILE NAME 07044901-xt, DATED 5/11/2010. <br />( <br />O <br />19 2 85 DISPENSER POWER (TYP.) <br />7 <br />❑ <br />A SEAL OFF MUST BE INSTALLED PRIOR TO ENTERING AND a <br />[JOUA2URBINE0 <br />fA1416,18 } <br />ATU <br />LEAVING A CLASSIFIED AREA. CONDUITS FIRST EMERGENCE FROM <br />BELOW GRADE <br />BINE <br />TURBINE TURBINE $ TURBINE r <br />MUST BE CONNECTED TO A SEAL -OFF. <br />*INSTALL <br />\ 1 <br />{ e f \ <br />�� <br />39 42 98 103 DISPENSER SENSORS (TYP.) <br />49139 CAMERA (POWER) <br />181 <br />CONDUIT., SHALL HAVE INSULATED GROUNDING BUSHINGS INSTALLED AND <br />TIED <br />TIED TOGETHER W/ #6 BARE COPPER WIRE. BOND ALL INSULATED GROUNDING <br />(4) CONDUITS AS FOLLOWS: 21 <br />�1 (1) 2•' C (PVC), (2) 25 PAIR CABLE (1) #12 OND. <br />I ➢ <br />} <br />—@(85)H <br />I _ H2O <br />� '1 � j <br />56140 141 CAMERA FEEDS <br />BUSHINGS AND GUTTER BOX BACK TO POWER CENTER GROUND. <br />ALL INSTALLATIONS SHALL BE PER N.E.C., ARTICLE 514. <br />VI WAREHOUSE MANAGERS OFFICE FOR SECURITY <br />VIDEO CAMERA FEEDS AND TELEPHONE SERVICE AT <br />� <br />L j <br />40 <br />42 98 10 103 <br />�, <br />p <br />INSTALL THREE (3) 1" CONDUITS FOR SUBMERSIBLE PUMP POWER AS FOLLOWS: ONE (1) <br />�- <br />_ / 6 TURBINE POWER <br />FUTURE ELECTRICAL <br />69 19 <br />CONDUIT AT TURBINE SUMP #1 (UNLEADED), ONE (1) AT TURBINE SUMP #`L (UNLEADED), <br />CONTROLLER ENCLOSURE (CONTINUOUS) FILL BY <br />EQUIPMENT J -BOXES <br />OWNER I.S. DEPT. <br />O <br />ONE (1) AT TURBINE SUMP #3 (PREMIUM). ALL TURBINE POWER TO BE 1" RIGID STEEL, <br />8 TURBINE POWER5 <br />19 <br />ROBROY PVC COATED CONDUIT (NO EXCEPTIONS). ALL SEAL -OFFS AND ELECTRICAL BOXES <br />2 (1) 2" C (PVC) <br />18-6 STRANDED SHIELDED CABLE (KEYPAD) <br />B-13 <br />B-9 <br />TO BE SET MINIMUM 6" ABOVE SUMP PENETRATIONS. TURBINE CONTROLLERS AT BUILDING <br />(1) <br />O <br />SHALL BE LABELED AS FOLLOWS: "A" TURBINE #1 UNLEADED REGULAR, "B" TURBINE 2 <br />( <br />(1) 18-2 STRANDED (DOOR CONTACTOR) <br />----@ TURBINE POWER <br />20 <br />UNLEADED REGULAR, "C" TURBINE #3 PREMIUM UNLEADED. <br />(1) 18-6 STRANDED (AUDIO DETECTOR) <br />6 <br />4 85 <br />O <br />(1) 18-2 ZIP CORD (SIREN) <br />VIDEO RECORDER SHALL BE INSTALLED IN THE MANAGER'S OFFICE, FIELD VERIFY LOCATION <br />W <br />FOR BURGLAR ALARM AT CONTROLLER ENCLOSURE <br />41 42 98 103 <br />WITH CONSTRUCTION PM OR ARCHITECT PM. <br />Q N <br />- - <br />TO WAREHOUSE MANAGERS OFFICE AND CONTINUE <br />W O <br />W/ 1" C TO BURGLAR PANEL (CONTINUOUS) FILL <br />BY RUN CONDUIT UP EXTERIOR OF -- <br />27 136 CANOPY LIGHTS <br />2 <br />NOT USED <br />CO 9 00 <br />I <br />OWNER I.S. DEPT. <br />COLUMN INSIDE COLUMN WRAP <br />O <br />(TYP.) ° —@912A <br />20 ° <br />VERIFY P.O.C., EQUIPMENT AND FEES WITH UTILITY COMPANY <br />J <br />O Q <br />® (1) 1" C (PVC), FIBER OPTIC CABLE (12 STRAND, 5MM <br />K JACKET) <br />3 <br />AND OWNER BEFORE <br />3 <br />TO WAREHOUSE MANAGERS OFFICE AND CONTINUED <br />TO EDP <br />42 <br />42 98 103 <br />INSTALLATIONS OF NEW ELECTRICAL SERVICE. <br />I W <br />- <br />ROOM (CONTINUOUS) FILL BY OWNER I.S. <br />14 <br />❑ <br />ALL EQUIPMENT SHALL BE U.L. APPROVED. <br />3 �4 _ <br />Q <br />6 J <br />35 (1) 1" C (PVC, SPARE WITH PULL ROPE <br />TO WAREHOUSE MANAGERS OFFICE AND CONTINUED <br />TO EDP O <br />9 <br />5 <br />E. <br />MOUNT .O ON SUPPORT BRACE JELDED TO 6" BOLLARDS PER DETAIL #11 ON SHEET <br />Z) <br />U O <br />B-2 <br />B-17 <br />A4.01. 4' ABOVE ADJACENT GROUND LEVEL (TYP.) <br />I- (7)O <br />ROOM (CONTINUOUS) <br />(n O <br />- -- <br />O <br />6 <br />MOUNT E.S.O. ON ENCLOSURE EXTERIOR. <br />O � <br />W <br />(ALL CONDUIT AND PULL ROPE BY G.C., CONDUIT PILL AS <br />NOTED.) <br />6 85 20 <br />0 <br />(NEW WAREHOUSE AND GAS FACILITY - CONDUITS TO WITHIN <br />5 FEET 0 <br />2 <br />7 <br />VERIFY TRANSFORMER PAD LOCATION, ELEVATION AND APPURTENANT, <br />OF CONTROLLER ENCLOSURE. PROVIDE PULL BOXES FOR CONDUITS <br />AS <br />43 42 98 103 <br />( <br />REQUIRED FOR EVERY 250 FEET OR AFTER (2) 90 DEGREE <br />I <br />BENDS <br />8 <br />c <br />ALL TANK FILL AND VAPOR RETURN RISERS SHALL BE GROUNDED TO PREVENT STATIC <br />--- -- <br />DISCHARGE <br />135 CANOPY FASCIA LIGHTS <br />. <br />(ALL CONDUITS TO BE ROUTED UNDER THE FREEZE LINE) <br />CANOPY ABOVE 1 <br />7 <br />126 <br />85 20 <br />19 <br />JUNCTION BOXES FOR FUTURE ELECTRICAL EQUIPMENT AT EXIT SIDE COLUMNS SHALT_ BE <br />i U <br />E-3 <br />23 136 FUTURE CANOPY LIGHTS <br />EXPLOSION PROOF WITH SEAL -OFF. SET J -BOXES 2' ABOVE ISLAND FORMS. <br />44 <br />42 98 103 <br />20 <br />ALL ELECTRICAL JUNCTION BOXES IN SUMPS AND DISPENSER PANS SHALL BE EXPLOSION <br />L? <br />CC <br />LL <br />FUEL POSITION NUMBERING <br />PROOF WITH SEAL -OFF ENTERING AND LEAVING. SEAL -OFFS TO BE A MINIMUM OF 6" <br /><( <br />ABOVE THE HIGHEST PENETRATION FOR TESTING PURPOSES. AT A MINIMUM, THE LST 2' <br />O <br />NOTE: FUELING POSITIONS AT THE DISPENSERS ARE <br />OF ANY CONDUIT RUN ENTERING OR LEAVING A BRINE FILLED DOUBLE WALL SUMP SHALL <br />w <br />NUMBERED AS FOLLOWS: <br />3 B-10 <br />19 <br />B-6 15 <br />BE PVC COATED RIGID METAL CONDUIT (TYP.) <br />(n <br />q <br />- <br />FUELING POSITION 1 IS ALWAYS THE OUTBOARD SIDE <br />OF THE FIRST DISPENSER ON THE ENTRANCE SIDE AND <br />C� <br />� <br />O T,� <br />21 <br />ALL NONMETALLIC CONDUIT SHALL HAVE THE LAST 2' OF THE UNDERGROUND RUN TO THE <br />W CV <br />J T <br />NON EXPANSION SIDE OF THE CANOPY. OPPOSITE SIDE <br />SHOWN. <br />09R0 20 <br />POINT OF EMERGENCE OR TO THE POINT OF CONNECTION TO THE ABOVE GROUND RACEWAY <br />TO BE THREADED <br />r <br />wco <br />N 0 <br />SHALL BE FUELING POSITION y2 AS <br />14 <br />O <br />10 <br />O <br />r <br />RIGID METAL CONDUIT. THE RIGID NONMETALLIC CONDUIT INCLUDING RIGID <br />�m <br />ir <br />NOTE FUEL POSITION DECAL NUMBERS ARE PROVIDED BY <br />19 <br />85 20 <br />❑ <br />NONMETALLIC CONDUIT ELBOWS & FITTINGS ARE REQUIRED TO BE LOCATED NOT LESS THAN <br />�- - <br />OWNER AND INSTALLED BY START UP TECHNICIAN. <br />45 42 98 103 <br />2' BELOW GRADE. TRANSITION FROM PVC TO RIGID METALLIC CONDUIT TO ABOVE GRADE <br />Q <br />46 <br />42 98 103 ETHERNET <br />SHALL TAKE PLACE AT THE 90• ELBOW AND ON UP TO GRADE. ALL METAL CONDUIT & <br />d Q Q <br />5,FUTURE <br />@ ALL DISPENSERS <br />FITTINGS SHALL BE WRAPPED WITH 10 MIL TAPE, .3 WRAPS. <br />MID r) <br />° <br />T� <br />DEMM <br />�•"� <br />EMERGENCY <br />SHUT-OFF SWITCH 110 15 <br />(TYP.) <br />Q�,�FEssroNq <br />o <br />F <br />Call 2 Free <br />1 (888RKWo8 0808 <br />Electrical Site Plan <br />.0 <br />29 <br />HAL BB <br />n. <br />A <br />B 4 i <br />LEGEND <br />9_.. <br />\ 30 0 <br />\ <br />C:t <br />ING DAYSE1 <br />BEFORE YOU <br />1 <br />EXISTING UNDERGROUND CONDUIT <br />9 IVO <br />DIG <br />P UNDERGROUND ELECTRICAL SERVICE CONDUIT <br />UNDERGROUND TELEPHONE SERVICE CONDUIT <br />TANK <br />HAZARDOUS AREA NOTES <br />SERVICE DATA <br />EXPOSED CONDUIT <br />VENTSN.E.C. <br />_v \ a < <br />o N \ <br />r <br />® ° <br />UNDERGROUND CONDUIT <br />O TYPICAL N.E.C. ARTICLE 514 CLASS 1 LOCATION UNDERGROUND TANK - FILL OPENING) <br />SERVICE VOLTAGE. 3 PH 120/208V, 4W <br />�r <br />� CLASS I HAZARDOUS AREA (PER NEC) <br />•->�- <br />EXTENT OF CLASS 1, GROUP D, DIVISION 1 LOCATION: <br />LOAD DATA: <br />of <br />Y� Y �� <br />ANY PIT, BOX, OR SPACE BELOW GRADE_ LEVEL, ANY PART OF WHICH IS WITHIN <br />CONNECTED 39.6 KVA ESTIMATED DEMAND 31.7 KVA SERVICE <br />� 8 <br />m <br />7 <br />EW <br />THE DIVISION 1 OR 2 CLASSIFIED LOCATION. <br />CONDUCTORS 4#3/0 THWN & 1#4 GND. <br />�� EXPLOSION PROOF SEAL <br />o N <br />EXTENT OF CLASS 1, GROUP D, DIVISION 2 LOCATION: <br />METERING: PER UTILITY <br />o <br />7 A <br /><Y <br />< <br />UP TO 18" ABOVE GRADE LEVEL WITHIN A HORIZONTAL RADIUS OF 10' FROM <br />TYPE: UNDERGROUND <br />INDICATES DISPENSER NUMBERING AND POSITION <br />O <br />a <br />o 2 g g <br />.; <br />A LOOSE FILL CONNECTION AND WITHIN A HORIZONTAL RADIUS OF 5' FROM A <br />BILLING INFORMATION: COSTCO WHOLESALE <br />TANK FILLS <br />TIGHT FILL CONNECTION. <br />999 LAKE DRIVE <br />HV HIGH VOLTAGE <br />ZB <br />TYPICAL N.E.C.ARTICLE 514 CLASS 1 LOCATION UNDERGROUND TANK - VENT -DISCHARGING UPWARD <br />ATTN:ISSAQAH, WA 98027 <br />TTN: Kim Sanford <br />LV LOW VOLTAGE <br />UNDERGROUND / <br />EXTENT OF CLASS 1, GROUP D, DIVISION 1 LOCATION: <br />TANKS <br />WITHIN 3' OF OPEN END OF VENT, EXTENDING IN ALL DIRECTIONS.w <br />VR VEEDER-ROOT <br />= <br />EXTENT OF CLASS 1, GROUP D, DIVISION 2 LOCATION: <br />° <br />SPACE BETWEEN 3' AND 5' OF OPEN END OF VENT, EXTENDING IN ALL <br />E.S.G. EMERGENCY SHUT-OFF <br />5 <br />DIRECTIONS. <br />CAUTION: <br />a <br />7 C <br />�C TYPICAL N.E.C. ARTICLE 514 CLASS 1 LOCATION (REMOTE PUMP - OUTDOOR) <br />POTENTIAL UTILITY CONFLICT. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING <br />E.D.P. ELECTRICAL DISTRIBUTION PANEL <br />z L< o z <br />EXTENT OF CLASS 1, GROUP D, DIVISION 1 LOCATION: <br />AND NEW UTILITIES PRIOR TO CONSTRUCTION. SEE UTILITY CONFLICT NOTE THE <br />w N N N Sz <br />TANK TURBINES <br />ANY PIT, BOX, OR SPACE BELOW GRADE LEVEL IF ANY PART IS WITHIN A <br />EXISTING WATER, STORM, AND SANITARY SEWER SERVICE SHOWN IS <br />C CONDUIT <br />> N of <br />¢ o N <br />HORIZONTAL DISTANCE OF 10' FROM ANY EDGE OF PUMP. <br />APPROXIMATE, BASED ON FIELD SURVEYS AND "AS -BUILT" RECORDS. THE <br />"POTHOLE" <br />F.F. FINISHED FLOOR <br />CO 00 w s z <br />M I <br />EXTENT OF CLASS 1, GROUP D, DIVISION 2 LOCATION: <br />GENERAL CONTRACTOR SHALL THE EXISTING UTILITIES TO VERIFY THE <br />N - _ <br />WITHIN 3' OF ANY EDGE OF PUMP, EXTENDING IN ALL DIRECTIONS. ALSO UP <br />DIAMETER AND LOCATION INCL. ELEVATIONS PRIOR TO CONSTRUCTION. ANY <br />( ) <br />�" N U-) z <br />ABOVE GRADE LEVEL WITHIN 10' HORIZONTALLY FROM ANY EDGE OF <br />DISCREPANCIES IN THE LOCATION OF THE EXISTING PIPE OR INCOMPATIBILITY OF <br />Mockingbird n <br />-- <br />n _ <br />w <br />PUM1P8" <br />THE DESIGN SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE OWNERS^^ <br />� <br />N Z N N <br />' <br />REPRESENTATIVE, AND RARGHAUSEN CONSULTING ENGINEERS 425-251-6222). <br />°' m 99 - ------ ° <br />Yid �� <br />O TYPICAL N.E.C. ARTICLE 514 CLASS 1 LOCATION (DISPENSING DEVICE - PITS) <br />zIHICHINH <br />Y <br />EXTENT OF CLASS 1, GROUP D, DIVISION 1 LOCATION: <br />UTILITY CONFLICT NOTE:° <br />Ln Periegos Way o IHHII 141HI0 <br />ANY PIT, BOX, OR SPACE BELOW GRADE LEVEL, ANY PART OF WHICH IS WITHIN <br />THE DIVISION 1 OR 2 CLASSIFIED LOCATION. <br />CAUTION <br />Oriole <br />c <br />HIIHHIIIHfIHIB <br />_ 7 <br />HIHIIHHXHHIHiH <br />s <br />.7� b3 <br />``` <br />7 D <br />E F G 1 <br />� <br />z <br />O TYPICAL N.E.C. ARTICLE 514 CLASS 1 LOCATION DEVICE DISPENSER) <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, <br />,� <br />� fr3 IIHIHiHIIIHII. <br />� OIHHp <br />J i <br />� <br />Q <br />� <br />(DISPENSING - <br />EXTENT <br />DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE <br />Culbertson <br />Dr SchaRerDr a, <br />a I, <br />I r i <br />DISPENSER ,., <br />AREA <br />f- <br />OF CLASS 1, GROUP D, DIVISION 1 LOCATION: <br />SPACE CLASSIFICATION INSIDE THE DISPENSER ENCLOSURE IS COVERED IN ANSI/UL <br />PLANS OR NOT BY POT HOLING THE UTILITIES AND SURVEYING THE HORIZONTAL <br />AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE <br />= �. <br />° r: 01 IHfHIIHffHIIHIIHNHko^' <br />l� <br />❑o <br />87, "POWER OPERATED DISPENSING DEVICES FOR PETROLEUM PRODUCTS." <br />CALLING UTILITY LOCATE @ 1 (800) 227-2600 AND THEN POT HOLING ALL OF <br />o a ONHIIHIIHIkIIHIHl18�} / <br />& <br />x <br />{ <br />O TYPICAL N.E.C. <br />THE EXISTING UTILITIES AT LOCATIONS OF NEP, UTILITY CROSSINGS TO <br />EHarneyLn <br />Nom <br />ARTICLE 514 CLASS 1 LOCATION (DISPENSING DEVICE - DISPENSER) <br />EXTENT OF CLASS 1, GROUP D, DIVISION 2 LOCATION: <br />PHYSICALLY VERIFY 'WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID <br />EHarneyLn <br />77, <br />�. <br />- -i <br />s <br />WITHIN 18' HORIZONTALLY IN ALL DIRECTIONS EXTENDING TO GRADE FROM 1'" <br />( ) <br />THE DISPENSER ENCLOSURE OR (2) THAT PORTION OF THE DISPENSER <br />UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED <br />PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD <br />OCCUR, THE CONTRACTOR SHALL CONSULT BARGHAUSEN CONSULTING <br />��Y T <br />SITE <br />_ <br />ENCLOSURE CONTAINING LIQUID HANDLING COMPONENTS. <br />ENGINEERS, INC. TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH <br />_ <br />ss <br />2 <br />Hazardous Location <br />LD.`� <br />G TYPICAL N, E.C. ARTICLE 514 CLASS 1 LOCATION DISPENSING DEVICE - OUTDOOR)S� <br />( <br />EXTENT OF CLASS 1, GROUP D, DIVISION 2 LOCATION: <br />CONSTRUCTION. <br />C� <br />T NOT TO SCALE NOT SCALE <br />1 <br />a <br />z <br />'' <br />I <br />E_1 <br />UP TO 18" ABOVE GRADE LEVEL WITHIN 20HORIZONTALLY OF ANY EDGE OFW <br />o r <br />SCALE I"= 20'-0" <br />CONTROLLER ENCLOSURE. <br />VICINITY MAP LOCATOR MAP <br />