G.C. SHALL INSTALL A DEDICATED,
<br />GENERAL NOTES
<br />UNSWITCHED FOURPLEX OUTLET IN
<br />WAREHOUSE EDP ROOM AND A
<br />DEDICATED UNSWITCHED DUPLEX
<br />NEW AT WAREHOUSE
<br />EDP ROOM
<br />k SEE CONDUIT -
<br />INSTALLATION NOTES
<br />SEE MATERIALS LIST (T-7) FOR SPECIFICATIONS ON EQUIPMENT
<br />(- )
<br />OUTLET BY BURGLAR PANEL IN EDP
<br />COSTCO
<br />5
<br />USED IN THIS CONSTRUCTION.
<br />V)
<br />ROOM UNDER WAREHOUSE SCOPE
<br />OF
<br />137 11
<br />SEE CIVIL PLANS FOR ROUTING
<br />2
<br />8 (44 #3/0 THWN C, U.
<br />�2
<br />ROUTING SHOWN ARE SCHEMATIC, FINAL LOCATIONS SHALL BE
<br />H m
<br />WORK. (POWER FROM WAREHOUSE
<br />BUILDING
<br />INFORMATION
<br />+" 1,
<br />E-3
<br />( ) C.U. E.G.
<br />SHOWN ON AS -BUILT DRAWINGS.
<br />F -
<br />O
<br />FOR VIDEO SYSTEM)
<br />591°
<br />-- 581"
<br />FUTURE DIAGNOSTIC 36 TANK MONITORING
<br />FUTURE POWER/COMM 37 TANK MONITORING
<br />14
<br />CONTROLLER
<br />117 ENCLOSURE 3 17 PROPOSED TRANSFORMER
<br />�
<br />ALL EQUIPMENT SHALL BE INSTALLED AS PER MANUFACTURER'S
<br />SPECIFICATIONS.
<br />#
<br />Z O
<br />Q Z N
<br />-—
<br />NOT TO SCALE
<br />38 TANK MONITORING
<br />LOCATION
<br />FUNCTIONS OF THE CONTINUOUS MONITORING:
<br />-MONITORING OF ALL ANNULAR SPACE.
<br />Q Q —j
<br />U
<br />- -
<br />/
<br />—MONITORING1 LL FILL
<br />p
<br />Q
<br />-PROVIDGPHAPRESSURECLINEPINGLEAR DDETECTIONU (PLLD) OF
<br />Q i Z LL
<br />(1)-3" UNDERGROUND ERGROUNDLL
<br />( )
<br />PRODUCT LINES
<br />J W �
<br />p[ W
<br />O O O
<br />n r PVC CONDUIT (SCHEDULE
<br />PROVIDE CONTINUOUS TANK LEVEL MONITORING.
<br />n' � ® Z
<br />U
<br />i
<br />_25 80) OR AS REQUIRED BY
<br />-MONITORING OF ALL DISPENSER SUMPS. a
<br />W Q U- J
<br />o j °
<br />>) POWER COMPANY.
<br />THE CONTINUOUS MONITORING DEVICE SHALL PROVIDE POSITIVE o
<br />F_ -
<br />= O
<br />---
<br />O
<br />•
<br />i EMERGENCY
<br />---VENT STACKS 16 110
<br />SHUT-OFF SWITCH
<br />__. n O
<br />SHUTDOWN OF TURBINES AND DISPENSERS AUTOMATICALLY IN
<br />THE EVENT OF A LIQUID RELEASE AND MANUALLY THROUGH THE
<br />Q
<br />J W Q
<br />O U
<br />Q N
<br />O
<br />TANK RISER
<br />200 ANAP, 3 -PH, 4W
<br />5 13 METER & DISCONNECT
<br />ESO SWITCH LOCATED ON THE CONTROLLER ENCLOSURE AND
<br />REMOTE ESO SWITCH AS INDICATED ON SITE PLAN.
<br />e
<br />i� N �
<br />O
<br />GROUNDING 18 OVERFILL 115 116
<br />ALARM
<br />ALL WIRES ENTERING CONTROL PANELS, MAIN PANELS, AND SUB
<br />g
<br />®
<br />J V
<br />(TYP. ALL TANKS) FILL FILL FILL
<br />i
<br />VEEDER ROOT
<br />o 114 4
<br />PANELS SHALL BE MARKED WITH PHASE TAPEY
<br />i—
<br />{ 911 PHONE 123
<br />PANEL
<br />CODING AS FOLLOWS: N
<br />"A" PHASE = BLACK
<br />1 Q
<br />C
<br />TANK #3 TANK #2
<br />139 CAMERA POWER
<br />SUPPLY LOCATION
<br />"B" PHASE = RED o
<br />"C" PHASE BLUE
<br />mT
<br />W
<br />SHEET INFORMATION NOTE:
<br />UNLEADED UNLEADED f ;UNLEADED O
<br />j PREMIUM REGULAR r REGULAR 1 _
<br />�� O
<br />3 ,.
<br />=
<br />if I � B-5
<br />B 1
<br />[6]
<br />ALL CONDUCTORS SHALL BE CONTINUOUS (WITH NO SPLICES) STRANDED
<br />S
<br />dj
<br />BASE SHEET INFORMATION PROVIDED BY MULVANNYG2,
<br /># ��,
<br />O
<br />COPPER WITH 75`C THWN INSULATION, OIL AND GAS RESISTANT. o
<br />FILE NAME 07044901-xt, DATED 5/11/2010.
<br />(
<br />O
<br />19 2 85 DISPENSER POWER (TYP.)
<br />7
<br />❑
<br />A SEAL OFF MUST BE INSTALLED PRIOR TO ENTERING AND a
<br />[JOUA2URBINE0
<br />fA1416,18 }
<br />ATU
<br />LEAVING A CLASSIFIED AREA. CONDUITS FIRST EMERGENCE FROM
<br />BELOW GRADE
<br />BINE
<br />TURBINE TURBINE $ TURBINE r
<br />MUST BE CONNECTED TO A SEAL -OFF.
<br />*INSTALL
<br />\ 1
<br />{ e f \
<br />��
<br />39 42 98 103 DISPENSER SENSORS (TYP.)
<br />49139 CAMERA (POWER)
<br />181
<br />CONDUIT., SHALL HAVE INSULATED GROUNDING BUSHINGS INSTALLED AND
<br />TIED
<br />TIED TOGETHER W/ #6 BARE COPPER WIRE. BOND ALL INSULATED GROUNDING
<br />(4) CONDUITS AS FOLLOWS: 21
<br />�1 (1) 2•' C (PVC), (2) 25 PAIR CABLE (1) #12 OND.
<br />I ➢
<br />}
<br />—@(85)H
<br />I _ H2O
<br />� '1 � j
<br />56140 141 CAMERA FEEDS
<br />BUSHINGS AND GUTTER BOX BACK TO POWER CENTER GROUND.
<br />ALL INSTALLATIONS SHALL BE PER N.E.C., ARTICLE 514.
<br />VI WAREHOUSE MANAGERS OFFICE FOR SECURITY
<br />VIDEO CAMERA FEEDS AND TELEPHONE SERVICE AT
<br />�
<br />L j
<br />40
<br />42 98 10 103
<br />�,
<br />p
<br />INSTALL THREE (3) 1" CONDUITS FOR SUBMERSIBLE PUMP POWER AS FOLLOWS: ONE (1)
<br />�-
<br />_ / 6 TURBINE POWER
<br />FUTURE ELECTRICAL
<br />69 19
<br />CONDUIT AT TURBINE SUMP #1 (UNLEADED), ONE (1) AT TURBINE SUMP #`L (UNLEADED),
<br />CONTROLLER ENCLOSURE (CONTINUOUS) FILL BY
<br />EQUIPMENT J -BOXES
<br />OWNER I.S. DEPT.
<br />O
<br />ONE (1) AT TURBINE SUMP #3 (PREMIUM). ALL TURBINE POWER TO BE 1" RIGID STEEL,
<br />8 TURBINE POWER5
<br />19
<br />ROBROY PVC COATED CONDUIT (NO EXCEPTIONS). ALL SEAL -OFFS AND ELECTRICAL BOXES
<br />2 (1) 2" C (PVC)
<br />18-6 STRANDED SHIELDED CABLE (KEYPAD)
<br />B-13
<br />B-9
<br />TO BE SET MINIMUM 6" ABOVE SUMP PENETRATIONS. TURBINE CONTROLLERS AT BUILDING
<br />(1)
<br />O
<br />SHALL BE LABELED AS FOLLOWS: "A" TURBINE #1 UNLEADED REGULAR, "B" TURBINE 2
<br />(
<br />(1) 18-2 STRANDED (DOOR CONTACTOR)
<br />----@ TURBINE POWER
<br />20
<br />UNLEADED REGULAR, "C" TURBINE #3 PREMIUM UNLEADED.
<br />(1) 18-6 STRANDED (AUDIO DETECTOR)
<br />6
<br />4 85
<br />O
<br />(1) 18-2 ZIP CORD (SIREN)
<br />VIDEO RECORDER SHALL BE INSTALLED IN THE MANAGER'S OFFICE, FIELD VERIFY LOCATION
<br />W
<br />FOR BURGLAR ALARM AT CONTROLLER ENCLOSURE
<br />41 42 98 103
<br />WITH CONSTRUCTION PM OR ARCHITECT PM.
<br />Q N
<br />- -
<br />TO WAREHOUSE MANAGERS OFFICE AND CONTINUE
<br />W O
<br />W/ 1" C TO BURGLAR PANEL (CONTINUOUS) FILL
<br />BY RUN CONDUIT UP EXTERIOR OF --
<br />27 136 CANOPY LIGHTS
<br />2
<br />NOT USED
<br />CO 9 00
<br />I
<br />OWNER I.S. DEPT.
<br />COLUMN INSIDE COLUMN WRAP
<br />O
<br />(TYP.) ° —@912A
<br />20 °
<br />VERIFY P.O.C., EQUIPMENT AND FEES WITH UTILITY COMPANY
<br />J
<br />O Q
<br />® (1) 1" C (PVC), FIBER OPTIC CABLE (12 STRAND, 5MM
<br />K JACKET)
<br />3
<br />AND OWNER BEFORE
<br />3
<br />TO WAREHOUSE MANAGERS OFFICE AND CONTINUED
<br />TO EDP
<br />42
<br />42 98 103
<br />INSTALLATIONS OF NEW ELECTRICAL SERVICE.
<br />I W
<br />-
<br />ROOM (CONTINUOUS) FILL BY OWNER I.S.
<br />14
<br />❑
<br />ALL EQUIPMENT SHALL BE U.L. APPROVED.
<br />3 �4 _
<br />Q
<br />6 J
<br />35 (1) 1" C (PVC, SPARE WITH PULL ROPE
<br />TO WAREHOUSE MANAGERS OFFICE AND CONTINUED
<br />TO EDP O
<br />9
<br />5
<br />E.
<br />MOUNT .O ON SUPPORT BRACE JELDED TO 6" BOLLARDS PER DETAIL #11 ON SHEET
<br />Z)
<br />U O
<br />B-2
<br />B-17
<br />A4.01. 4' ABOVE ADJACENT GROUND LEVEL (TYP.)
<br />I- (7)O
<br />ROOM (CONTINUOUS)
<br />(n O
<br />- --
<br />O
<br />6
<br />MOUNT E.S.O. ON ENCLOSURE EXTERIOR.
<br />O �
<br />W
<br />(ALL CONDUIT AND PULL ROPE BY G.C., CONDUIT PILL AS
<br />NOTED.)
<br />6 85 20
<br />0
<br />(NEW WAREHOUSE AND GAS FACILITY - CONDUITS TO WITHIN
<br />5 FEET 0
<br />2
<br />7
<br />VERIFY TRANSFORMER PAD LOCATION, ELEVATION AND APPURTENANT,
<br />OF CONTROLLER ENCLOSURE. PROVIDE PULL BOXES FOR CONDUITS
<br />AS
<br />43 42 98 103
<br />(
<br />REQUIRED FOR EVERY 250 FEET OR AFTER (2) 90 DEGREE
<br />I
<br />BENDS
<br />8
<br />c
<br />ALL TANK FILL AND VAPOR RETURN RISERS SHALL BE GROUNDED TO PREVENT STATIC
<br />--- --
<br />DISCHARGE
<br />135 CANOPY FASCIA LIGHTS
<br />.
<br />(ALL CONDUITS TO BE ROUTED UNDER THE FREEZE LINE)
<br />CANOPY ABOVE 1
<br />7
<br />126
<br />85 20
<br />19
<br />JUNCTION BOXES FOR FUTURE ELECTRICAL EQUIPMENT AT EXIT SIDE COLUMNS SHALT_ BE
<br />i U
<br />E-3
<br />23 136 FUTURE CANOPY LIGHTS
<br />EXPLOSION PROOF WITH SEAL -OFF. SET J -BOXES 2' ABOVE ISLAND FORMS.
<br />44
<br />42 98 103
<br />20
<br />ALL ELECTRICAL JUNCTION BOXES IN SUMPS AND DISPENSER PANS SHALL BE EXPLOSION
<br />L?
<br />CC
<br />LL
<br />FUEL POSITION NUMBERING
<br />PROOF WITH SEAL -OFF ENTERING AND LEAVING. SEAL -OFFS TO BE A MINIMUM OF 6"
<br /><(
<br />ABOVE THE HIGHEST PENETRATION FOR TESTING PURPOSES. AT A MINIMUM, THE LST 2'
<br />O
<br />NOTE: FUELING POSITIONS AT THE DISPENSERS ARE
<br />OF ANY CONDUIT RUN ENTERING OR LEAVING A BRINE FILLED DOUBLE WALL SUMP SHALL
<br />w
<br />NUMBERED AS FOLLOWS:
<br />3 B-10
<br />19
<br />B-6 15
<br />BE PVC COATED RIGID METAL CONDUIT (TYP.)
<br />(n
<br />q
<br />-
<br />FUELING POSITION 1 IS ALWAYS THE OUTBOARD SIDE
<br />OF THE FIRST DISPENSER ON THE ENTRANCE SIDE AND
<br />C�
<br />�
<br />O T,�
<br />21
<br />ALL NONMETALLIC CONDUIT SHALL HAVE THE LAST 2' OF THE UNDERGROUND RUN TO THE
<br />W CV
<br />J T
<br />NON EXPANSION SIDE OF THE CANOPY. OPPOSITE SIDE
<br />SHOWN.
<br />09R0 20
<br />POINT OF EMERGENCE OR TO THE POINT OF CONNECTION TO THE ABOVE GROUND RACEWAY
<br />TO BE THREADED
<br />r
<br />wco
<br />N 0
<br />SHALL BE FUELING POSITION y2 AS
<br />14
<br />O
<br />10
<br />O
<br />r
<br />RIGID METAL CONDUIT. THE RIGID NONMETALLIC CONDUIT INCLUDING RIGID
<br />�m
<br />ir
<br />NOTE FUEL POSITION DECAL NUMBERS ARE PROVIDED BY
<br />19
<br />85 20
<br />❑
<br />NONMETALLIC CONDUIT ELBOWS & FITTINGS ARE REQUIRED TO BE LOCATED NOT LESS THAN
<br />�- -
<br />OWNER AND INSTALLED BY START UP TECHNICIAN.
<br />45 42 98 103
<br />2' BELOW GRADE. TRANSITION FROM PVC TO RIGID METALLIC CONDUIT TO ABOVE GRADE
<br />Q
<br />46
<br />42 98 103 ETHERNET
<br />SHALL TAKE PLACE AT THE 90• ELBOW AND ON UP TO GRADE. ALL METAL CONDUIT &
<br />d Q Q
<br />5,FUTURE
<br />@ ALL DISPENSERS
<br />FITTINGS SHALL BE WRAPPED WITH 10 MIL TAPE, .3 WRAPS.
<br />MID r)
<br />°
<br />T�
<br />DEMM
<br />�•"�
<br />EMERGENCY
<br />SHUT-OFF SWITCH 110 15
<br />(TYP.)
<br />Q�,�FEssroNq
<br />o
<br />F
<br />Call 2 Free
<br />1 (888RKWo8 0808
<br />Electrical Site Plan
<br />.0
<br />29
<br />HAL BB
<br />n.
<br />A
<br />B 4 i
<br />LEGEND
<br />9_..
<br />\ 30 0
<br />\
<br />C:t
<br />ING DAYSE1
<br />BEFORE YOU
<br />1
<br />EXISTING UNDERGROUND CONDUIT
<br />9 IVO
<br />DIG
<br />P UNDERGROUND ELECTRICAL SERVICE CONDUIT
<br />UNDERGROUND TELEPHONE SERVICE CONDUIT
<br />TANK
<br />HAZARDOUS AREA NOTES
<br />SERVICE DATA
<br />EXPOSED CONDUIT
<br />VENTSN.E.C.
<br />_v \ a <
<br />o N \
<br />r
<br />® °
<br />UNDERGROUND CONDUIT
<br />O TYPICAL N.E.C. ARTICLE 514 CLASS 1 LOCATION UNDERGROUND TANK - FILL OPENING)
<br />SERVICE VOLTAGE. 3 PH 120/208V, 4W
<br />�r
<br />� CLASS I HAZARDOUS AREA (PER NEC)
<br />•->�-
<br />EXTENT OF CLASS 1, GROUP D, DIVISION 1 LOCATION:
<br />LOAD DATA:
<br />of
<br />Y� Y ��
<br />ANY PIT, BOX, OR SPACE BELOW GRADE_ LEVEL, ANY PART OF WHICH IS WITHIN
<br />CONNECTED 39.6 KVA ESTIMATED DEMAND 31.7 KVA SERVICE
<br />� 8
<br />m
<br />7
<br />EW
<br />THE DIVISION 1 OR 2 CLASSIFIED LOCATION.
<br />CONDUCTORS 4#3/0 THWN & 1#4 GND.
<br />�� EXPLOSION PROOF SEAL
<br />o N
<br />EXTENT OF CLASS 1, GROUP D, DIVISION 2 LOCATION:
<br />METERING: PER UTILITY
<br />o
<br />7 A
<br /><Y
<br /><
<br />UP TO 18" ABOVE GRADE LEVEL WITHIN A HORIZONTAL RADIUS OF 10' FROM
<br />TYPE: UNDERGROUND
<br />INDICATES DISPENSER NUMBERING AND POSITION
<br />O
<br />a
<br />o 2 g g
<br />.;
<br />A LOOSE FILL CONNECTION AND WITHIN A HORIZONTAL RADIUS OF 5' FROM A
<br />BILLING INFORMATION: COSTCO WHOLESALE
<br />TANK FILLS
<br />TIGHT FILL CONNECTION.
<br />999 LAKE DRIVE
<br />HV HIGH VOLTAGE
<br />ZB
<br />TYPICAL N.E.C.ARTICLE 514 CLASS 1 LOCATION UNDERGROUND TANK - VENT -DISCHARGING UPWARD
<br />ATTN:ISSAQAH, WA 98027
<br />TTN: Kim Sanford
<br />LV LOW VOLTAGE
<br />UNDERGROUND /
<br />EXTENT OF CLASS 1, GROUP D, DIVISION 1 LOCATION:
<br />TANKS
<br />WITHIN 3' OF OPEN END OF VENT, EXTENDING IN ALL DIRECTIONS.w
<br />VR VEEDER-ROOT
<br />=
<br />EXTENT OF CLASS 1, GROUP D, DIVISION 2 LOCATION:
<br />°
<br />SPACE BETWEEN 3' AND 5' OF OPEN END OF VENT, EXTENDING IN ALL
<br />E.S.G. EMERGENCY SHUT-OFF
<br />5
<br />DIRECTIONS.
<br />CAUTION:
<br />a
<br />7 C
<br />�C TYPICAL N.E.C. ARTICLE 514 CLASS 1 LOCATION (REMOTE PUMP - OUTDOOR)
<br />POTENTIAL UTILITY CONFLICT. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
<br />E.D.P. ELECTRICAL DISTRIBUTION PANEL
<br />z L< o z
<br />EXTENT OF CLASS 1, GROUP D, DIVISION 1 LOCATION:
<br />AND NEW UTILITIES PRIOR TO CONSTRUCTION. SEE UTILITY CONFLICT NOTE THE
<br />w N N N Sz
<br />TANK TURBINES
<br />ANY PIT, BOX, OR SPACE BELOW GRADE LEVEL IF ANY PART IS WITHIN A
<br />EXISTING WATER, STORM, AND SANITARY SEWER SERVICE SHOWN IS
<br />C CONDUIT
<br />> N of
<br />¢ o N
<br />HORIZONTAL DISTANCE OF 10' FROM ANY EDGE OF PUMP.
<br />APPROXIMATE, BASED ON FIELD SURVEYS AND "AS -BUILT" RECORDS. THE
<br />"POTHOLE"
<br />F.F. FINISHED FLOOR
<br />CO 00 w s z
<br />M I
<br />EXTENT OF CLASS 1, GROUP D, DIVISION 2 LOCATION:
<br />GENERAL CONTRACTOR SHALL THE EXISTING UTILITIES TO VERIFY THE
<br />N - _
<br />WITHIN 3' OF ANY EDGE OF PUMP, EXTENDING IN ALL DIRECTIONS. ALSO UP
<br />DIAMETER AND LOCATION INCL. ELEVATIONS PRIOR TO CONSTRUCTION. ANY
<br />( )
<br />�" N U-) z
<br />ABOVE GRADE LEVEL WITHIN 10' HORIZONTALLY FROM ANY EDGE OF
<br />DISCREPANCIES IN THE LOCATION OF THE EXISTING PIPE OR INCOMPATIBILITY OF
<br />Mockingbird n
<br />--
<br />n _
<br />w
<br />PUM1P8"
<br />THE DESIGN SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE OWNERS^^
<br />�
<br />N Z N N
<br />'
<br />REPRESENTATIVE, AND RARGHAUSEN CONSULTING ENGINEERS 425-251-6222).
<br />°' m 99 - ------ °
<br />Yid ��
<br />O TYPICAL N.E.C. ARTICLE 514 CLASS 1 LOCATION (DISPENSING DEVICE - PITS)
<br />zIHICHINH
<br />Y
<br />EXTENT OF CLASS 1, GROUP D, DIVISION 1 LOCATION:
<br />UTILITY CONFLICT NOTE:°
<br />Ln Periegos Way o IHHII 141HI0
<br />ANY PIT, BOX, OR SPACE BELOW GRADE LEVEL, ANY PART OF WHICH IS WITHIN
<br />THE DIVISION 1 OR 2 CLASSIFIED LOCATION.
<br />CAUTION
<br />Oriole
<br />c
<br />HIIHHIIIHfIHIB
<br />_ 7
<br />HIHIIHHXHHIHiH
<br />s
<br />.7� b3
<br />```
<br />7 D
<br />E F G 1
<br />�
<br />z
<br />O TYPICAL N.E.C. ARTICLE 514 CLASS 1 LOCATION DEVICE DISPENSER)
<br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION,
<br />,�
<br />� fr3 IIHIHiHIIIHII.
<br />� OIHHp
<br />J i
<br />�
<br />Q
<br />�
<br />(DISPENSING -
<br />EXTENT
<br />DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE
<br />Culbertson
<br />Dr SchaRerDr a,
<br />a I,
<br />I r i
<br />DISPENSER ,.,
<br />AREA
<br />f-
<br />OF CLASS 1, GROUP D, DIVISION 1 LOCATION:
<br />SPACE CLASSIFICATION INSIDE THE DISPENSER ENCLOSURE IS COVERED IN ANSI/UL
<br />PLANS OR NOT BY POT HOLING THE UTILITIES AND SURVEYING THE HORIZONTAL
<br />AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE
<br />= �.
<br />° r: 01 IHfHIIHffHIIHIIHNHko^'
<br />l�
<br />❑o
<br />87, "POWER OPERATED DISPENSING DEVICES FOR PETROLEUM PRODUCTS."
<br />CALLING UTILITY LOCATE @ 1 (800) 227-2600 AND THEN POT HOLING ALL OF
<br />o a ONHIIHIIHIkIIHIHl18�} /
<br />&
<br />x
<br />{
<br />O TYPICAL N.E.C.
<br />THE EXISTING UTILITIES AT LOCATIONS OF NEP, UTILITY CROSSINGS TO
<br />EHarneyLn
<br />Nom
<br />ARTICLE 514 CLASS 1 LOCATION (DISPENSING DEVICE - DISPENSER)
<br />EXTENT OF CLASS 1, GROUP D, DIVISION 2 LOCATION:
<br />PHYSICALLY VERIFY 'WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID
<br />EHarneyLn
<br />77,
<br />�.
<br />- -i
<br />s
<br />WITHIN 18' HORIZONTALLY IN ALL DIRECTIONS EXTENDING TO GRADE FROM 1'"
<br />( )
<br />THE DISPENSER ENCLOSURE OR (2) THAT PORTION OF THE DISPENSER
<br />UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED
<br />PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD
<br />OCCUR, THE CONTRACTOR SHALL CONSULT BARGHAUSEN CONSULTING
<br />��Y T
<br />SITE
<br />_
<br />ENCLOSURE CONTAINING LIQUID HANDLING COMPONENTS.
<br />ENGINEERS, INC. TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH
<br />_
<br />ss
<br />2
<br />Hazardous Location
<br />LD.`�
<br />G TYPICAL N, E.C. ARTICLE 514 CLASS 1 LOCATION DISPENSING DEVICE - OUTDOOR)S�
<br />(
<br />EXTENT OF CLASS 1, GROUP D, DIVISION 2 LOCATION:
<br />CONSTRUCTION.
<br />C�
<br />T NOT TO SCALE NOT SCALE
<br />1
<br />a
<br />z
<br />''
<br />I
<br />E_1
<br />UP TO 18" ABOVE GRADE LEVEL WITHIN 20HORIZONTALLY OF ANY EDGE OFW
<br />o r
<br />SCALE I"= 20'-0"
<br />CONTROLLER ENCLOSURE.
<br />VICINITY MAP LOCATOR MAP
<br />
|