My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
COMPLIANCE INFO 2016 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 2:34:16 PM
Creation date
11/6/2018 12:48:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2017
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\ROTH\116\PR0523684\COMPLIANCE INFO 2016 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2016 - 2017
QuestysRecordDate
4/24/2018 11:35:23 PM
QuestysRecordID
3866361
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST Program: Tank Infornmtia Permit Application: CERS Regulator Page 1 of 2 <br /> 46 <br /> Tank ID#4 <br /> Calitornia Environmental Reporting System:Regulator vicki mccartney's Account Sxm OL t Tools Renorts NgkQ <br /> Submittals Facilities Businesses Regulators Compliance Responders Reports <br /> LIST Tank Information/Monitoring Plan: Fast Lane Central Valley <br /> Home DD Submittal Search N Submittal 712612017 10063345) DD UST:UST Tank Information/Monitoring Plan(Not Accepted) <br /> Submittal Element Histo <br /> Submitted for CERS tD 10063345 on 7/26/2017 3:30PM by Sharlene Woods of Fast Lane Central Valley(Lathrop,GAl <br /> Submittal was Not Accepted on 8115/2017 by vicki mccartneyfor San Joaquin Ceun Environmental Health <br /> Comments by regulator.This UST submittal was not accepted by Vicki McCartney,RENS,ICC Certified UST Inspector,on August 15,2017.The following <br /> items need to be addressed/corrected:Tank information for Tanks 4 and 5-under Vent,Vapor Recovery(VR),and Riser/Fill Pipe Piping Construction,remove <br /> "Fiberglass"from Vapor Recovery Primary Containment.Tank Monitoring is not correct for all 5 tanks:under Tank Monitoring is Performed Using the Following <br /> Method(s),enter 303 for Leak Sensor Model#and remove Brine Interstitial 304 sensor,under Pipe Monitoring is Performed Using the Following Method(s),add <br /> the 304 sensor to the 208 sensor(208,304)for Leak Sensor Model;beneath Under Dispenser Containment(UDC)Monitoring,add the 208 sensor to the 304 <br /> sensor(208,304)for UDC Leak Sensor Madel.Resubmit the Certification of Financial Responsibility after completing Section B.Resubmit the Letter from Chief <br /> Financial Officer after correcting#4(subtraction error).Submit an accurate UST Monitoring Site Plan since the current map is not correct. <br /> (2 View Monitoring Plan Retum to Submittal <br /> IT <br /> Type of Actioype of Action(UST Tank) <br /> Renewal Permit <br /> Facility Information <br /> Fast Lane Central Valley <br /> 116 Roth Rd <br /> Lathrop , CA 95330 <br /> nk Description <br /> Tank to# Date UST System Installed Tank Configuration <br /> 712012007 A Stand-alone lank <br /> Tank Manufacturer CO Date Existing UST Discovered Number of Compartments in the Unit <br /> Containment Solutions - 1 <br /> Tank Capacity In Gallons Date UST Permanently Closed Additional Description <br /> 20000 <br /> Tank Use and Conten Tank Construction <br /> Tank Use Tank Contents Type of Tank <br /> Motor Vehicle Fueling Diesel Double Wall <br /> Other Petroleum Contents <br /> _ Primary Containment Secondary Containment <br /> Other Non-Petroleum Contents Fiberglass Fiberglass <br /> Overfill Protection <br /> Yes AudibleNasual Alarms No Fill Tube Shut-Off Valve <br /> No Ball Float No Exempt <br /> Product!Waste Piping Construction <br /> Piping Construction Primary Containment I Secondary Containment I PipinglTurbine Containment Sump <br /> Double-walled Fiberglass Fiberglass Double-walled <br /> Piping System Type - <br /> Pressure <br /> Vent,Vapor Recovery(VR)and Riser!Fill Pipe Piping Construction <br /> Vent Primary Containment Va or Recovery Primary Containment Riser Pipe Primary Containment Vent Piping Transition Sumps <br /> Fiberglass Fiberglass`' f e M 0 V e-- Steel Double-walled <br /> Fill Components Installed <br /> Vent Secondary Containment Vapor Recovery Secondary Containment Riser Pipe Secondary Containment Yes Spill Bucket <br /> Fiberglass - Fiberglass Yes Striker Platel6ottom Protector <br /> - Yes Containment Sump <br /> Under Dispenser Containment(UDC) Corrosion Protection <br /> Construction Type Construction Material No Sacrificial Anode <br /> Double-walled Fiberglass No Impressed Current <br /> - Yes Isolation <br /> Cmated By:Sharers woods on 7125120179,47 AM <br /> Last Updated 9y:Si woods on 712512017 12:38 PM View Monitoring Plan Return t0 Submittal <br /> VersVon 2.23.0016 1 Enhancements 1 CERS Central A�iC CE tact Help <br /> https://cersregulator.calepa.ca.govBusiness/33354/Facility/10063345/Submittal/UST/2396... 8/15/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.