Laserfiche WebLink
I _ � ft ft <br /> UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN— PAGE I (One form per facility) <br /> TYPE OF A ON ❑ 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION Rol. <br /> I. FACILITY INFORMATION <br /> FACILITY I D# (Agency Use Only) <br /> BUSINE /1/-s <br /> ((Soomme as FACILITY NAME.) R02. <br /> BUSINESS ITE ADDRESS ,7 R03. CITY R14, <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> This planaddresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> Y If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> ➢ Any relc ne to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain t ie hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their ritended use,will be managed as hazardous waste. <br /> ➢ Absorbei it material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non hazardous. Used absorbent material.reusable or waste, will be stored in a properly labeled and sealed container. Waste material shall be disposed <br /> appropri telt'. <br /> ➢ Facility ersonnel will determine whether any water removed from secondary containment systems, or from clean-up activity,has been in contact with any <br /> hazardou i material.If the water is contaminated,it will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds <br /> that it is on-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not necessarily display <br /> rainbow,olors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> ➢ We will -view secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. H dous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Seco idary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III, SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC dAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary, <br /> EQUIPME NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: (Complete vniv if applicable) <br /> EQUB'ME LOCATION AVAILABILITY <br /> t R1Q. -rue i - rA c rc R2� �L R3Q. <br /> �.� RI1. R2.1. �+ x f R31, <br /> R12. .l.7 A � 222/ (✓ � �'L!� R32, <br /> .,. R13. .L�./ lt' lj �d R23. R33. <br /> � 5 <br /> R14. e / Lt !I� �=1 R24. IG �.J R34. <br /> R35. <br /> ` IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)ISIARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME _ R40. TITLE Rya. <br /> NAME /I R41- TITLE / R51, <br /> NAME � Raz. T[TLE1�1_g� 4;12 � rJ y /� Rsz <br /> ME <br /> NAR43. TITLE R53. <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ❑Additional system testing or data collection �O Inspection <br /> � by qualiifed persons C7 Recalibration of e�qui¢pmcnYtt <br /> Other: �- l1� Tr 1qt r1/ Ale llwn� ortx.rtyZ, AleGa� c <br /> R60 <br /> Gf l/ yop <br /> S . <br /> 4.+lI& <br /> T/fe <br /> -, t e 4;7'/_C A */ ;s ooe_-k �ti Wane Ay4 4 LL el- Aw <br /> UST Response Plan(312008)-113 1v_ <br /> �� #4 <br />