My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1990
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SCOTTS
>
235
>
2300 - Underground Storage Tank Program
>
PR0502978
>
REMOVAL_1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2019 9:42:55 AM
Creation date
11/6/2018 1:18:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1990
RECORD_ID
PR0502978
PE
2381
FACILITY_ID
FA0005635
FACILITY_NAME
CALIFORNIA PALLETS CO
STREET_NUMBER
235
Direction
W
STREET_NAME
SCOTTS
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
14711019
CURRENT_STATUS
02
SITE_LOCATION
235 W SCOTTS AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\S\SCOTTS\235\PR0502978\1990 REMOVAL .PDF
QuestysFileName
1990 REMOVAL
QuestysRecordDate
12/29/2016 12:02:53 AM
QuestysRecordID
3301195
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN .7OAC2UIN LOCAL HEALTH DISTRICT <br /> SAMPLING PROTOCAL FOR ROUTINE TANK REMOVALS <br /> The following represents minimum sampling criterion required for closure compliance. Soil <br /> samples collected shall be representative of native soils beneath the tank 's <br /> invert (tank 's bottom] at a collection depth not be exceed 2 - 9 feet. If contamination <br /> is documented during closure an Unauthorized Release notification must be filled out and <br /> submitted to SJLHD within 5 days. Section 2652, CCR. <br /> WATER NOT PRESENT IN THE TANK PIT <br /> TANK SIZE MINIMUM NUMBER OF LOCATION OF SOIL SAMPLES <br /> SOIL SAMPLES <br /> Less than 1000 gallons ONE per tank Fill or pump end of tank <br /> 1000 - 10,000 gallons TWO per tank One at each end of tank <br /> 10,001 gallons and up THREE OR MORE Ends and Middle or <br /> r tankgenerally s ced along <br /> the length of the tank <br /> Piping ONE EVERY 20 LINEAL FEV1' <br /> WATER IS PRESENT IN TANK PIT <br /> TANK SIZE MINIMUM NO. OF LOCATION OF SOIL MINIMUM NUMBER <br /> _SOIL SAMPLES SAMPLES OF WATER SAMPLES <br /> 10,000 GALLONS From wall next to <br /> OR LESS tank ends at soil/ <br /> (Single Tank) TWOgroundwater ONE <br /> interface <br /> GREATER THAN From wall next to ONE <br /> 10,000 GALLONS tank ends at soil/ <br /> ORgroundwater <br /> NK <br /> TACLUSTER FOUR interface <br /> OTHER SPEC I AT COND I T I ON S <br /> SLAB PRESENT IN TANK PIT <br /> Soil samples shall be obtained beneath the slab within native soils. Penetration through <br /> the obstruction will be required in order to collect the samples. [Physical removal of the <br /> obstruction will then allow sampling according to the above conditions. ] <br /> ------ ...-- - -- - - -- - — - - -.... ------------- ----- - _... <br /> TANK SIZE MINIMUM NUMBER OF LOCATION OF SOIL SAMPLES <br /> SOIL SAMPLES <br /> _=-_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.