Laserfiche WebLink
' ARCADIS <br /> Table of Contents <br /> ' 5.1.4 LNAPL Pore-Entry Pressure Calculations 23 <br /> 5.1.5 Dissolved-Phase Plume Stability 24 <br /> 5.2 LNAPL Mobility Results and Discussion 24 <br /> ' 5.2.1 LNAPL Observations in Monitoring Wells 24 <br /> 5.2.2 LNAPL Field and Residual Saturations 25 <br /> ' 5.2.3 LNAPL Pore Velocity Calculations 25 <br /> 5.2.4 LNAPL Pore-Entry Pressure Calculations 26 <br /> 5.2.5 Dissolved-Phase Plume Stability 27 <br /> ' 5.3 LNAPL Mobility Summary and Conclusions 27 <br /> 6. Low-Risk Site Closure Evaluation 28 <br /> ' 7. Conclusions/Recommendations 32 <br /> 8. References <br /> 33 <br /> Tables <br /> Table 1 Total Extractable Petroleum Hydrocarbons as Diesel Groundwater <br /> ' Analytical Results <br /> Table 2 Groundwater Elevations <br /> ' Table 3 HydroPunchT Analytical Results <br /> Table 4 LNAPL Bail-down Testing and Analysis Results <br /> ' Table 5 Laboratory Fluid Physical Properties <br /> Table 6 Petrophysical Aquifer Properties <br /> ' Table 7 Results of Laboratory Analytical Tests Showing Initial and Residual <br /> LNAPL Saturation <br /> Table 8 Summarized Results of LNAPL Velocity at Field Saturation <br /> Table 9 Summarized Results of Critical LNAPL Thickness Calculations Based on <br /> Brooks and Corey Model <br /> ' Figures <br /> Figure 1 Site Location Map <br /> ' Figure 2 Site Layout <br /> Figure 3 March 2010 A-Zone Groundwater Elevation Contours <br /> i <br /> Mu q4N pl me Ift114&410)bx <br />