Laserfiche WebLink
' Morton Paint Company <br /> April 30 , 1987 <br /> WORK STEP <br /> Drill 10 soil boring sample and analyze <br /> 10 soil samples from bottom of tank pit <br /> using EPA Method 8240 <br /> ' Trench, lav conduit , run vapor transport, <br /> tubing, install panel, resurface asphalt, <br /> system start-up and s.':akedown <br /> ° Console CMS-3000 (aces pct include sales tax <br /> Miscellaneous Materials <br /> (conduit, well screen, vanor transport tube ) <br /> 1 <br /> Total Installation Costs <br /> Monitoring Well Installation <br /> ° Drill and install 4 monitoring wells to <br /> 60 feet. Develop and sample wells analyze <br /> 4 water samples using FFA Method 624 . <br /> Prepare drill logs . <br /> Total Costs for Facility <br /> Compliance (Alternative 2 ) <br /> 1 <br /> 8 <br />