My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1993
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STEVENSON
>
3507
>
2300 - Underground Storage Tank Program
>
PR0232520
>
REMOVAL_1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2024 4:07:25 PM
Creation date
11/6/2018 2:18:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1993
RECORD_ID
PR0232520
PE
2381
FACILITY_ID
FA0004056
FACILITY_NAME
WILLIAM VALLINCIA
STREET_NUMBER
3507
STREET_NAME
STEVENSON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
3507 STEVENSON AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\S\STEVINSON\3507\PR0232520\REMOVAL 1993 .PDF
QuestysFileName
REMOVAL 1993
QuestysRecordDate
10/12/2017 3:35:03 PM
QuestysRecordID
3676165
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br /> COMMUNITY DEVELOPMENT DEPARTMENT <br /> 1810 E. HAZELTON AVE..STOCKTON.CA 95205 <br /> c+��! �.�`► DEVELOPMENT SERVICES PHONE 12091 458.3120 <br /> PLANNING PHONE (2091 468.3120 <br /> BUILDING PHONE: (2091 468.312 <br /> NEIGHBORHOOD PRESEnVATION PHONE 1209) 468.3021 <br /> BACKFILL EXCAVATION CERTIFICATE <br /> Project Location 3507 STEVINSON STREET STOCKTON DA 95205 <br /> Owner WILLIAM VALENCIA Phone No. (209) 948 9003 <br /> ContractorFA, cmPhone No. (209) 403 7108 License No. "A" HAZ <br /> -- E-R� . <br /> 584524 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's compaction Report within 30 days of project <br /> completion, or <br /> 2. Submission of verification, e.g. load ticket, within 30 days of project <br /> completion that one of the following materials was placed in the excavation in <br /> 12" lifts: <br /> 5C A. Pea gravel - smooth, rounded material not more than one-half (1/2) <br /> 01Z inch in diameter. <br /> ?� B. Crushed rock - self-compacting material not more than three-quarters <br /> (3/4) inch in cross sectional measurement. (Use of crushed rock <br /> will not be permitted for backfill if contact will be made between <br /> the backfill material and tanks/pipes made of poly resin glass or <br /> similar materials. ) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer' s Compaction Report will be submitted within 30 days <br /> of project completion, or submission of verification that the select material described above <br /> will be placed at a minimum of five (5) cubic yards per 1000 gallon tank displacement and <br /> that the entire excavation will be backfilled and compacted to insure compliance with the <br /> Uniform Building Code Appendix Chapter 70. <br /> * ,JAMES J. HOBLITZELL <br /> Name. (Print) <br /> V.P. & ENvIRONMENTAL MANAGER <br /> Title (Print) <br /> tt urs <br /> * Shall be the responsible managing employee on the license or authorized <br /> agent. <br /> 6/91-LC/BECERT.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.