My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_FEBRUARY 1993
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STOCKTON
>
1137
>
2300 - Underground Storage Tank Program
>
PR0231256
>
REMOVAL_FEBRUARY 1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 11:16:00 AM
Creation date
11/6/2018 2:25:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
FEBRUARY 1993
RECORD_ID
PR0231256
PE
2381
FACILITY_ID
FA0009393
FACILITY_NAME
IDEALEASE OF STOCKTON INC
STREET_NUMBER
1137
Direction
S
STREET_NAME
STOCKTON
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16326022
CURRENT_STATUS
02
SITE_LOCATION
1137 S STOCKTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\S\STOCKTON\1137\PR0231256\FEBRUARY 1993 REMOVAL .PDF
QuestysFileName
FEBRUARY 1993 REMOVAL
QuestysRecordDate
8/8/2017 5:27:02 PM
QuestysRecordID
3559604
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br /> o <br /> COMMUNITY DEVELOPMENT DEPARTMENT <br /> 1810 E HAZELTON AVE..SfOCKTON,CA 95295 <br /> r ��r <br /> DEVELOPMENT SERVICES <br /> 1795 PHONE ,(209) 468.3120 <br /> pRING PHONE- <br /> BUIl41NG PHONE,(2091468-3123 <br /> NEJGH90RHO00 PRESERVATION PHONE(209)468-3021 <br /> BACKFILL EXCAVATION CERTIFICATE <br /> Project Location X-Me- -70 / 5Ti2E <br /> Owner �U � �'� r�J6 CD P Phone No <br /> Contractor ! 'CAC0 Phone No.Zo� 66-1 License NO. W?961 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days of project <br /> completion, or <br /> 2. Submission of verification, e.g. load ticket, within 30 days of project <br /> completion that one of the following materials was placed in the excavation in <br /> 12" lifts: <br /> A. Pea gravel - smooth, rounded material not more than one-half (1/2) <br /> inch in diameter. <br /> B. Crushed rock -- self-compacting material not more than three-quarters <br /> (3/4) inch in cross sectional measurement. (Use of crushed rock <br /> will not be permitted for backfill if contact will .be made between <br /> the backfill material and tanks/pipes made of poly resin glass or <br /> similar materials.) <br /> DECLARATION - <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days <br /> of project completion, or submission of verification that the select material described above <br /> will be placed at a minimum of five (5) cubic yards per 1000 gallon tank displacement and <br /> that the entire excavation will be backfilled and compacted to insure compliance with the <br /> Uniform Building Code Appendix Chapter 70. <br /> Name (Print) <br /> ES/�, /ltATp/Z <br /> Title (Print) <br /> LAS <br /> signature <br /> * Shall be the responsible managing employee on the license or authorized <br /> agent. <br /> 6/91-LC/BECEAT.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.