Laserfiche WebLink
r ` NEW LIST I = ALLATION INSPECTION RECO <br /> [FACILITY NAt(E: MAOS � SS `N RLSL ADDRESS:EPS41 `'IVf / 3� s�oc,K--m� �� �TANKS UL0TANK Mt7DELJMATERIAL: <br /> ACiTY:�/�On �6�Q1? -a'(,0(} <br /> PRWUCT: �Ic L, GA5QLjNL R.E.H-S: <br /> A I <br /> P R ALL TANKS TO BE INSTALLED AND TESTED IM ACCORDANCE <br /> P I LITH <br /> R T MANUFACTURER WRITTEN SPECIFICATIONS <br /> 0 I <br /> Y A <br /> E L <br /> D S <br /> DATE ITEM OR EQUIPMENT INSPECTED <br /> 1. IJST PLANS SUBMITTED/ FEES PAID <br /> // (H+S CODE 25287, CCR 2635 (D) (8) <br /> rf � 2. UST INSTALLATION PLANS APPROVED (CCR 2635 CE) (5)) <br /> INITIAL INSPECTIONS <br /> -Z g nQ 3. INSPECTION AND TEST OF SECONDARY CCNTAINMENT: <br /> HOLIDAY: <br /> YACIAJl1:' SOAP: PSI: HRS/11IN: BRINECLIOUID ANNULAR): OTHER: <br /> 4. PRIMARY TANK TEST: �?� � -;r(t. PSI: �51 HRS/XIN• <br /> ' 3 lJ p.t ry <br /> fi(& TANK APPROPRIATELY PLACED WITH APPROVED BACKFIL <br /> Put 2535 (A) (3) (4) (6)/ API/PEI? <br /> PIPING INSPECTIONS <br /> V1 r 6. PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) (CCR 2635 (B) (4)) <br /> f1 "-7. SECONDARY PIPING CONTAINMENT TEST PSI- <br /> -5- HRS/MIN: -30 OTHER: (CCR 2535 (A) (4}) <br /> 8. LAUD? TEST ON ALL SUMPS (24 HR. MINI") HRS: <br /> (CCR 2635 (A)) <br /> 4, UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED (CCR 2635) <br /> Z `/ y"/ ,? A- OVERSPILL PERFORMANCE TEST <br /> (CCR 2635 (A) (4)) <br /> I `� . M 11. ALL PIPING AND FITTINGS CORROSION PROTECTED <br /> (CCR 2635 (B)) <br /> FINAL INSPECTION <br /> 12. PERFORMANCE TEST FOR "ALL" MONITORING PROBES <br /> (CCR 2632 {C) (2)) <br /> �( l 13. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) <br /> (CCR 2532 (A) (2)) <br /> 14- PERFORMANCE TEST OF LINE LEAK DETECTION <br /> (CCR 2532 (D) 2635 (B) (5)} <br /> 15. PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF <br /> �^ 6. BALL FLOAT VALVES INSTALLED (CCR 2535 (B) CS}) <br /> (CCR 2035 (B) (6)) <br /> f 17. OVERFILL PROTECTION INSTALLED/APPROVED <br /> (CCR 2535 (E) (2)) <br /> �,lJr 18. TANK ACCESS PORTS BROUGHT TO GRADE CLOCX,ED AND WATERTIGHT) <br /> (CCR 2631 (D) (S)) <br /> 14- TANK INTEGRITY TEST (PASSING HARD COPT) <br /> (CCR 2535 (A) (5)) <br /> Z�17 lj 20. MONITO'ING PLAN, RESPONSE PLAN AND LOG BOCK ON SITE <br /> (CCR 2532 (E) (1) (2)} <br /> ✓ ri 21. •C" FORM COMPLETED An SUBMITTED <br /> (CCR 2635 (E)) <br /> `Z _l/r �I 22. MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2541-2644) <br /> '_- ALL CONDITIONS MET; FACILITY PERMIT ISSUED <br /> (H+S CODE 25284 (E) (F)) <br /> CCMMENTS' L4 LZ <br />:H23--105 3/42 (REVISED 11\42) <br /> 8 <br />