Laserfiche WebLink
Shelby Lathrop (ConocoPhillips)and Don Pratt(ARCO) <br /> 1502 N. EI Dorado Street and 16 E. Harding Way, Stockton <br /> Page 4 of 5 <br /> show MtBE concentrations that appear to have maximized and were declining when <br /> the wells were first monitored in 2002; a possible exception being the singular <br /> concentration at 9,400 Ng/I in DMW-3 in January 2005. As the MtBE concentrations <br /> in that well are usually less than 5 ug/I, the EHD suspects the January 2005 data is <br /> not reliable. There are no B' zone data. <br /> The contaminant in the CP site A zone wells appears to primarily be MtBE, there is <br /> little BTEX present and the TPH-g concentrations tend to be similar to the MtBE <br /> concentrations. 1,2-DCA is present in some A zone wells. <br /> MtBE appears to have first impacted the CP site B zone wells roughly in the same <br /> time period as the A zone wells were impacted, but the B zone wells commonly were <br /> also impacted by TPH-g and BTEX one to three years before the MtBE impact was <br /> discernable. <br /> The TPH-g and BTEX impact to groundwater in the CP site B zone wells years prior <br /> to their being impacted by MtBE and the lack of TPH-g and BTEX in the CP site A <br /> zone wells can be interpreted to indicate that the B zone contaminants migrated <br /> laterally onto the site from an up-gradient source. The MtBE impact long after the <br /> groundwater was impacted by TPH-g and BTEX may indicate several stages of <br /> contaminant release; the latter one(s) with MTBE formulated gasoline. The lack of <br /> confirmed MtBE in CP site boring soil samples collected from depths more than 4 <br /> feet bsg may indicate that the dissolved MtBE in A zone wells MW-1 and MW-2 and <br /> B zone wells migrated laterally onto the site. <br /> The EHD is concerned about the increasing MTBE concentrations in the CP well <br /> MW-5 and with the unmonitored B' zone; therefore ConocoPhillips and ARCO are <br /> directed to submit work plans th the EHD by 01 August 2007 to characterize the B' <br /> zone in up-gradient, cross-gradient and down-gradient directions. <br /> The Work Plan for Feasibility Testing (WP), dated November 29, 2006, prepared for <br /> CP by SECOR compares soil excavation, dual phase extraction (DPE), chemical <br /> oxidation, and natural attenuation as remedial alternatives for the CP site. Based on <br /> the depth to first ground water (-30' bgs) and the depth to the most intensely <br /> impacted soil (-60' bgs), excavation is deemed ineffective for the site, a conclusion <br /> that has EHD concurrence. Due to the same factors and the relatively high <br /> permeability of the soil, the potential for successful application of DPE is also in <br /> doubt. <br /> Natural attenuation is the SECOR-recommended technology to apply to the site; the <br /> EHD is unlikely to approve such an approach as it may require many years to <br /> achieve background conditions. To grant a "no further action required" status for a <br /> site with residual contamination, the contaminant concentration trends must exhibit a <br /> continual and predicable decline and reach background conditions within a <br /> reasonable, predicable time frame. SECOR did not provide an estimate of the time <br /> required for such achievement. <br />