My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
3500 - Local Oversight Program
>
PR0508502
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2018 8:52:39 PM
Creation date
11/6/2018 3:18:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508502
PE
3526
FACILITY_ID
FA0008117
FACILITY_NAME
ARCO STATION #4932
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRO&ENTAL HEALTAEPARTMENT <br /> SAN JOAQUIN COUNTY <br /> o c <br /> Unit Supervisors <br /> �. ,, Donna K.Heran,RE.H.S. 304 East Weber Avenue, Third Floor Carl Borgman,R.E.H.S. <br /> �� _� Director Mike Huggins,R.E.H.S.,R.D.I. <br /> Al Olsen,R.E.H.S. Stockton, California 95202-2708 Douglas W.Wilson,R.E.H.S. <br /> • c'. a.-NSP Program Manager Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S. <br /> Laurie A.Cotulla,R.E.H.S. Robert McClellon,R.E.H.S. <br /> Program Manager Fax: (209)464-0138 <br /> Mark Barcellos,R.E.H.S. <br /> PAUL SUPPLE <br /> ATLANTIC RICHFIELD COMPANY <br /> P O BOX 6549 <br /> MORAGA CA 95470 <br /> RE: ARCO Station#4932 Site Code: # 1136 <br /> 16 E.Harding Way <br /> Stockton CA 95204 <br /> WORKPLAN: Addendum to Work Plan for Additional Site Assessment and Feasibility Testing dated Jan. 15,2002. <br /> DATED: March 11,2002 <br /> PREPARED BY: SECOR International Incorporated <br /> APPROVED: (xj <br /> DISAPPROVED: l` 1J <br /> ADDENDUM NEEDED: Submit by: <br /> 3 <br /> ADEAND NECESSARY ELEMENTS OF THE WORK PLAN [HBcS 25299.37subd(c)( )]: <br /> Approved changes to the original work plan are as follows: <br /> 1. A total of two,instead of three,shallow groundwater monitoring wells will be installed offsite in the down- <br /> gradient direction. <br /> 2. A total of two,instead of one,groundwater extraction wells will be installed. The original work plan <br /> proposed one extraction well onsite. The addendum adds another extraction well offsite. Also,the <br /> construction of these wells has been changed from 4-inch diameter PVC screens to 6-inch diameter wire <br /> wrapped screens. <br /> 3. The project schedules have been modified to fit the deadlines set by SJC/EHD in their 02/14/02 letter. <br /> COMMENTS AND CONDITIONS: <br /> Onsite well installations have been scheduled for March 14-15,2002;SJC/EHD well permit#0029071 has been issued. <br /> Offsite well installations will take place as soon as City of Stockton revocable and encroachment permits are obtained. <br /> Interim remediation measures of groundwater extraction by pumping are to begin the week of March 18,2002,and will <br /> be expanded to include the offsite groundwater extraction well once it is installed. The extraction events are expected to <br /> take place every two weeks. <br /> DATED <br /> 3( ( 3 16 Z BY L0 vl Gl l� wv.r o.t� <br /> Lori Duncan Senior RENS (209 461 8-0337 <br /> cc: Marry Hartzell,CVRWQCB <br /> Clint Harms,SECOR-by fax <br />
The URL can be used to link to this page
Your browser does not support the video tag.