Laserfiche WebLink
PUBLIe HEAL'T'H SE VICES <br /> SAN JOAQUIN COUNTY , <br /> ENVIRONMENTAL HEALTH DIVISION i <br /> Karen Furst, M.D., M.P.H., Health Officer <br /> 304 East Weber Avenue,Third Floor • Stockton, CA 95202 arae+ <br /> 209/468-3420 <br /> PAUL SUPPLE DEC 0 7 2001 <br /> ARCO PRODUCTS COMPANY <br /> P 0 BOX 6549 <br /> MORAGA CA 95470 <br /> RE: ARCO Station#4932 SITE CODE: 1136 <br /> 16 E. Harding Way <br /> Stockton CA 95204 <br /> San Joaquin County Public Health Services, Environmental Health Division (PHS/EHD) has <br /> reviewed the"Interim Remediation/Multi-Phase Extraction Feasibility Test Report"dated May 10, <br /> 2001 and the"Additional Site Assessment Report'dated November 9,2001 that were prepared <br /> by SECOR International Incorporated (SECOR)on your behalf and has the following comments. <br /> The Feasibility Test Report documents a multi-phase extraction (MPE)pilot test that took place <br /> the week of February 12-16, 2001. Please note that this report was submitted to PHS/EHD four <br /> weeks late. The objective of the MPE test, as stated in the work plan dated December 14, 2000, <br /> was to reduce the potential for further migration of dissolved hydrocarbons in groundwater, and to <br /> determine the long-term feasibility of using MPE as a remedial method for the site. In addition, <br /> the work plan proposed that laboratory analytical results of groundwater samples collected during <br /> the next quarterly sampling event following the test would be compared to the results of sampling <br /> events completed prior to the test to evaluate the effectiveness of using MPE to remediate the <br /> petroleum hydrocarbon contaminated groundwater at the site. The test was performed with a <br /> dual phase(soil vapor and groundwater)extraction system. The test was performed on <br /> groundwater monitoring well MW-4, soil vapor extraction well SVE-1, and a combination of both <br /> wells. <br /> During the week of the MPE test, PHS/EHD staff made several visits to the site to observe the <br /> progress of the test and to speak with the SECOR field staff monitoring the test. The technician <br /> on site informed PHS/EHD that a pumping test would be performed on MW-2 and MW-4 on <br /> Friday February 16, 2001. When PHS/EHD arrived at the site on Friday morning they were <br /> informed that the pumping test on MW-2 had been performed the afternoon before. The pumping <br /> test on MW-4 was performed on Friday as scheduled. However, the report fails to discuss either <br /> of these tests. The SECOR technician reported to PHS/EHD that neither well could sustain a <br /> pumping rate of even 0.5 gallons per minute. The California Code of Regulations requires <br /> responsible parties to compare at least two cleanup alternatives for their feasibility in mitigating <br /> the contamination and for their cost effectiveness. Since two different tests were performed at <br /> this site, two different tests should have been discussed in the report. <br /> The report concludes that MPE technology is a feasible remedial alternative for mitigating <br /> hydrocarbon-impacted soil at the site, but makes no comment about mitigation of the <br /> contamination in the groundwater. The report also made no comments on the concentrations of <br /> contamination in the groundwater in samples collected prior to the MPE test as compared to <br /> those collected after the MPE test. <br /> A Division of San Joaquin County Health Care Services <br />