My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
3500 - Local Oversight Program
>
PR0508502
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2018 8:52:39 PM
Creation date
11/6/2018 3:18:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508502
PE
3526
FACILITY_ID
FA0008117
FACILITY_NAME
ARCO STATION #4932
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC HPALTH SERVICES <br /> SAN JOAQUIN COUNTY ¢,' <br /> ENVIRONMENTAL HEALTH DIVISION ": < <br /> Karen Furst, M.D., M.P.H., Health Officer <br /> r . P <br /> 304 East Weber Avenue, Third Floor • Stockton, CA 95202 <br /> 209/468-3420 <br /> PAUL SUPPLE <br /> ARCO PRODUCTS COMPANY <br /> P O BOX 6549 <br /> MORAGA CA 95470 <br /> RE: ARCO Station#4932 Site Code: k 1136 <br /> 16 E.Harding Way <br /> Stockton CA 95204 <br /> WORKPLAN: Work Plan for Interim Remediation/Feasibility Testing <br /> DATED: December 14,2000 <br /> PREPARED BY: SECOR International Incorporated <br /> APPROVED: [x] <br /> DROVED: LL 11 <br /> AADDENDUMNEEDED: Submit by <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN[H&S 25299.37,subd(c)(3)]: <br /> 1.Five-day interim remediation/feasibility test using a dual phase (soil vapor and ground water) extraction system. <br /> 2.The test will be conducted using site wells SVE-1 and MW-4(not MW-3 as stated in the work plan). <br /> 3. Extracted soil vapors will be treated with an thermal oxidizer unit under permit from the San Joaquin Valley Air <br /> Pollution Control District. Air samples will be collected periodically for analysis of TPHg(EPA Method 8015m), <br /> BTEX(EPA Method 8020) and fuel oxygenates(EPA Method 8260) at a CA State Certified Laboratory. <br /> 4. Extracted liquids will be contained in a Baker Tank pending characterization and disposal at an approved facility. <br /> 5. A report of findings will be prepared and submitted to PHS/EHD within eight weeks after completion of the test. <br /> 6. Site specific Health and SaferyPlan was included in the work plan. <br /> COMMENTS AND CONDITIONS: <br /> 1. Fortyxeight hours notice to PHS/EHD is required prior to initiating fieldwork <br /> . FILE COPY <br /> DATED 2 i 100 BY ECCl <br /> Lori Duncan,Senior REHS (209)468-0337 <br /> CC: Marty Hartzell.CVRWQCB <br /> R=yBenkosky,SECOR <br /> A Division of San Joaquin County Health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.