My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
3500 - Local Oversight Program
>
PR0508502
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2018 8:52:39 PM
Creation date
11/6/2018 3:18:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508502
PE
3526
FACILITY_ID
FA0008117
FACILITY_NAME
ARCO STATION #4932
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIT IV LOP <br /> LTCP NO FURTHER ACTION (NFA) CLOSURE CHECK LIST <br /> �1 <br /> ��/ B/20/13 <br /> SITE ADDRESS: �j E. )44rd;, 42 Q W4V DATE:_ I - 28 -lie <br /> SITE NAME: LOP STAFF: <br /> ZILG/41REQUEST FOR CLOSURE(AKA NFA) up loaded into GT by RP/consultant, within 60 days LOP staff reviews and <br /> 7—/—receipts ESI with link to regulator's response in GT. If Staff verifies site meets LTCP closure criteria, then gain PG's <br /> concurrence. PG saves LTCP check list as"FINAL°,"READY/ELIGIBLE FOR CLOSURE"in GT. <br /> ^� LOP Staff verified GeoTracker(GT) "Closure Review'screen still marked "No" at"Is This Case Ready for Closure?" <br /> LOP Staff advises CVRWQCB of NFA consideration to prepare for Unit meeting. <br /> LOP Staff asks RP consultant's for Tri-Regional Appendix A submittals to GT of: Time to reach WQG, Initial and <br /> removed mass estimates, soil vapor study(if applicable). Submittals received on: RB notified on <br /> 746:MP staff and PG/PC discuss NFA and LTCP READY FOR CLOSURE consideration with CVRWQCB at Unit Meeting, <br /> by phone, or e-mail. RB informally concurs on 2 -/3/RB requires: n a"1„- .I <br /> to concur w/closure. <br /> GLOP Staff drafts Case Closure Summary(CCS)and CCS is reviewed by'third party' staff member: r <br /> C aha 9 <br /> /J / LOP Staff prepares 30-day notification letter to CVRWQCB of intention to issue an NFA that includes the CCS. <br /> W4+&-,- Pvrv - <br /> / r V-r a,Q 0401�� <br /> 2Jf? I LOP Staff submits 30-day CVRWQCB le er CS and file to C for review and signature. <br /> ' CVRWQCB 30-day response date up on: oncurrence received on: URB requests extension <br /> to: . Non-concurrence letter from CV CB Management received on: Staff up loads EHD letter <br /> to CVRWQCI�without CCS and CVRWQCB concurrence for closure letter in GT on <br /> / tall or consultant prepares 60 day Public Participation Notice(PPN). <br /> � [[ Finalized PPN sent/posted notifying effected properties and adjacent properties. 60 days up on Z7 <br /> 2(/�fv��[ PPN sent to city/county Building Dept& til rahrwater purveyor. 60 days up on <br /> Z / <br /> 11 Name&Address-list of all recipients (confidential) and PPN filed in LOP file. PPN up loaded into GT o 2 7.r y <br /> t '/ ocumentation received, filed, and flagged that indicates the"current record owner(s)of fee title to the site have <br /> been notified", per Section 25297.15 (a). The NFA closure letter may not be issued without this documentation. <br /> J 13 LOP Staff directs RP to destroy all MWs, remove all waste material & provide documentation of proper waste <br /> disposal. LOP staff reviews and approves work plan for well destruction. <br /> arY MW Destruction permits issued (after 60 days of PPN) &Johnny notified of impending work. <br /> LOP Staff documents destruction of all MW. GT"Groundwater Monitoring"screen updated to indicate wells are <br /> destroyed. The NFA closure letter may not be issued until MWs are destroyed. <br /> LOP Staff verifies and flags documentation received indicatingall onsite waste material removed and <br /> properly <br /> disposed and verified with EHD accounting all SR& D site fees have been paid. The NFA closure letter may <br /> not be issued without this documentation. GT"Closure Review"screen marked"Yes"at"Is This Case Ready <br /> for Closure?" <br /> LOP Staff asks clerical to prepare NFA&CCS for Director's signature within 30 days of MW destroyed and <br /> waste material properly disposed, & provides RPs name and addresses to be sent original NFA. PG/PC <br /> reviews file with flagged documents and approves issuance of NFA letter by Director. Signed CCS and NFA <br /> are copied. Originals mailed to RPs. Copies filed into LOP File, PC, and staff to upload into GT. <br /> Clerical staff updates Envision to reflect site is Closed. <br /> LOP staff pulls all site files for clerical staff to file in LOP Closed File cabinets, until scanned into Questys. <br /> LOP staff updates GT"Project Information" screens to reflect site status as Closed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.