Laserfiche WebLink
APN Well ID Well Type Call Diameter Casing Material Total Depth Original Borehole Diameter Surface Material Method of Abandonment Comm. <br /> MW-5 Monitor 2-inch PVC 40.50 8-Inch tliam. concrete Overdrill and seal with cement to 3'bgs. Located <br /> Ml Monitor 2-inch PVC 40.50 all tliam. concrete Overdrill and seal with Cement to 3'bill Located <br /> MWJ Monitor 2-inch PVC 40.50 8-inch tliam. concrete Ovardrill and seal with cementto 3'bill Located <br /> all Monitor 2-inch PVC 40.50 8-Inch dlam. concrete Clear/remove top 3'and pressure grout(25 psi for 10 minutes) Located <br /> MW-10 Monitor 2-inch PVC 41.00 8-inch diam. asphalt Clear/remove top 3'and pressure greet(25 psi for 10 minutes) Located <br /> MW-31 Monitor 2-Inch PVC 40.50 8-inch charm. concrete Clear/remove top 3'and pressure grout(25 psi for SD minutes) Located <br /> DMW-2 Monitor 2-inch PVC 82.50 8-inch diam. concrete Overdrill and seal with cementto 3'b . Locatetl <br /> DMW-3 Monitor 2-inch PVC 83.50 8-inch diam. concrete Overdrill and seal with cementto 3'bgs. Located <br /> DMW-6 Monitor 2-inch PVC 25.00 6-inch claim. concrete Overdrill and seal with cement to 3'bin. Located <br /> DMW-2 Monitor 2-inch PVC 25.00 6-Inch claim. concrete Overdrill and seal with cement to 3'bgs. Located <br /> DMW-9 Monitor 2-inch PVC 21.00 6-inch diam. asphalt Overdrill and seal with cement to 3'bgs. Located <br /> City of Stockton DMW-10 Monitor 2-inch PVC 20.00 6-Inch claim. concrete Overdrill and seal with cement W Vials. Located <br /> EW-2 Water Extraction 6-Inch SS 50.00 12-inch diam. concrete Overdrill and seal with cement to Tags. Located <br /> EW-3 Water Fntmation 6-inch 55 41.00 12-Inch clam. concrete Overdrill and seal with cement W 3-logs. Located <br /> MA Water Extraction 54nch SS 41.00 12-inch diam. concrete Ovevdrill and seal with cement to 3'bgs. Located <br /> • EW-5 Water Extraction 6-inch 55 41.00 12-Inch diam. concrete Clear/remove top 3'and pressure grout(25 psi for 10 minutes) Located <br /> EW-7 Water Extraction 6-inch 55 43.00 12-inch diam. concrete Overdrill and seal with cement to 3-bar, Located <br /> 5-1 Ozone Sparge OJ5-Inch PVC 40.00 B-inch diam. concrete Overddll and seal with cement to 3'bgs. Located. <br /> 5-2 Ozone Sparge 0.25-inch PVC 40.00 8-inch clam. concrete Overdrill and seal with cement to 3-bars. Located <br /> 5-3 Ozone Sparge 0J5-inch PVC 40.00 8-inch diam. concrete Overdrill and seal with cement to 3'bgs. Located <br /> 5-0 Ozone Sparge 0.25-inch PVC 40.00 8-inch diam. concrete 0verdrill and seal with cement o 3'bills. Located <br /> 5-5 Ozone Sparge 0.75 inch PVC 40.00 ¢-Inch diam. concrete Overdrlll and seal with cement to 3'bills. Located <br /> 5-5 Ozone Sparge 0.25-Inch PVC 40.00 8-Inch diam. concrete Clear/removetop 3'and pressure grout(25 psi for 10 minutes) Located <br /> MW-1 Monitor 4-inch PVC 41.50 30-Inch diam. asphalt Overdrill and seal with cement to 3'bgs. None <br /> MW-2 Monitor 4-inch PVC 41.50 30-inch diam. asphalt Overdrill and seal with cement to 3'bgs. None <br /> MW-3 Monitor 4-1nch PVC 41.50 10-inch diam, asphalt Overdrill and seal with cement to 3'bgs. None <br /> MW-4 Monitor 4-inch PVC 41.50 10-Inch than. asphalt Overdrill and seal with cement to 3'bgs. None <br /> DMW-1 Monitor 2-inch PVC 81.00 8-inch clam. asphalt Overdrill and seal with cement to 3'bgs. None <br /> 139-020.01 OMW-0 Monitor 2-inch PVC 22.00 6-Inch clam. asphalt Overdrill and seal with cement to 3'bgs. None <br /> DMW-5 Monitor 2-inch PVC 71.00 6-inch diam. asphalt Overdrill and seal with cement to 3'bgs. None <br /> SVE-1 Vapor E#raction 2-inch PVC 31.50 10-Inch diam. asphalt Overdrill and seal with cement to 3'bgs. None <br /> SVE-2 Vapor Extraction 2-Inch PVC 31.50 8-inch diam. asphalt Overdrill and seal with cement to Vail None <br /> EW-1 Water EM2Rion 6-Inch 55 50.00 8-Inch plan. asphalt Overdrill antl seal with cement to 3-bills. None <br /> EW-fi Water&traction 6-Inch 55 41.50 8-inch diam. asphalt Overdrillandsealwith cementto3'bgs. Located <br /> 139-02003 MW-8 Monitor 2-inch PVC 41.50 8-Inchdlad. asphalt Clear/remove top 3'and pressure Smut(25 psi for 10 minutes) Located <br /> • <br /> 1 <br />