My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
3500 - Local Oversight Program
>
PR0508502
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2018 7:09:59 PM
Creation date
11/6/2018 3:19:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0508502
PE
3526
FACILITY_ID
FA0008117
FACILITY_NAME
ARCO STATION #4932
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• S ECOR _ • --- <br /> Work Plan for Monitoring Well Installation <br /> July 31, 2007 <br /> Former ARCO Service Station No. 4932 <br /> Stockton, California <br /> Page 3 <br /> boring for well MW-6 (8.2 mg/kg) suggested that additional investigation for vertical off-site <br /> delineation was warranted. Based on groundwater analytical results, SECOR concluded that <br /> the lateral extent of GRO and benzene had been defined by wells MW-5 through MW-8; <br /> however the presence of MTBE in groundwater samples collected from well MW-6 and depth- <br /> discrete groundwater samples from boring SB-2 confirmed that further lateral and vertical <br /> delineation of the dissolved MTBE plume was required within these areas. SECOR further <br /> concluded that the presence of GRO and benzene in upgradient well MW-9 suggested that an <br /> additional source(s) of petroleum hydrocarbons might be present in the area. Results of this <br /> investigation are documented in SECOR's Additional Site Assessment Report, dated November <br /> 9, 2001. <br /> In 2001, SECOR conducted a door-to-door survey of businesses and residences in the area to <br /> identify any water supply wells within a 500-foot radius of the site. A questionnaire was supplied <br /> to those businesses or residences that could not be contacted first hand. Based on review of <br /> verbal and written survey results returned to SECOR, there were no water supply wells <br /> confirmed within a 500-foot radius of the site. According to the SJCEHD, in a letter dated <br /> November 21, 2000, two water supply wells were documented in the vicinity of the site. One <br /> water supply well was located in a field approximately '/z mile east of the site at the Stockton <br /> State Hospital and the other water supply well was located approximately 2,000 feet northwest <br /> of the site at the intersection of Wyandotte and Commerce Streets. Results of the well survey <br /> are included in SECOR's report titled, Additional Site Assessment Report, dated November 9, <br /> 2001. <br /> Also in 2001, SECOR performed a utility survey to evaluate whether nearby off-site utilities or <br /> other underground improvements may act as potential conduits for migration of petroleum <br /> hydrocarbons. Since depth to water at the site is approximately 27 feet bgs and no <br /> underground improvements or utilities were identified near this depth, it is unlikely that any <br /> subsurface utilities or other unknown underground improvements are preferential migration <br /> pathways for petroleum hydrocarbon-impacted groundwater. SECOR concluded that higher <br /> potential exists for vapor-phase contaminant migration through these areas (SECOR, Additional <br /> Site Assessment Report, dated November 9, 2001). <br /> As a result of the discovery of LPH in wells MW-4 and SVE-1 during the Fourth Quarter 2001 <br /> sampling event on July 20, 2001, weekly interim groundwater remediation was initiated on <br /> October 29, 2001, which consisted of the removal of LPH and petroleum hydrocarbon-impacted <br /> groundwater from the wells with a bailer. Interim GWE continued for approximately six weeks <br /> until measurable LPH was no longer present. Between October 29, 2001 and December 17, <br /> 2001, approximately 10 to 15 gallons of LPH had been removed from the wells. As a result of <br /> the continued presence of elevated concentrations of petroleum hydrocarbons and MTBE in on- <br /> site wells, interim groundwater extraction (GWE) was reinitiated on March 18, 2002 utilizing a <br /> vacuum truck. Between March 18 and August 2, 2002, approximately 23,350 gallons of LPH <br /> and petroleum hydrocarbon-impacted groundwater had been removed from beneath the site. <br /> On March 14 and 15, 2002, West Hazmat installed one deep groundwater monitoring well <br /> (DMW-1) and one GWE well (EW-1) at the site. DMW-1 and EW-1 were completed at 81 feet <br /> bgs and 44 feet bgs, respectively. Stabilized groundwater levels in wells DMW-1 and EW-1 <br /> were measured at 29 and 28 feet bgs, respectively. Soils collected between approximately 30 <br /> feet and 69.5 feet bgs from the boring for deep well DMW-1 and all samples collected between <br /> 15 feet and 47.5 feet bgs from the boring for EW-1 reported detectable concentrations of TPHg <br /> 4932 WP for Mw Installation 2007.doc SECOR International Incorporated <br />
The URL can be used to link to this page
Your browser does not support the video tag.