. S ECOR • <br /> Work Plan for Monitoring Well Installation <br /> July 31, 2007 <br /> Former ARCO Service Station No. 4932 <br /> Stockton, California <br /> Page 7 <br /> Permitting <br /> The required monitoring well installation and abandonment permits (Attachment C) will be <br /> obtained from San Joaquin County Environmental Health Department (SJCEHD). <br /> Task 2 —Soil Boring Advancement, Soil Sampling, and Monitoring Well Installation <br /> Seven off-site soil boring/groundwater monitoring wells (DMW-4, DMW-5, DMW-6, DMW-7, <br /> DMW-8, DMW-9, and DMW-10) are proposed at the approximate locations shown on Figure 2. <br /> The locations of the proposed wells may require field modification due to unforeseen conditions <br /> such as obstructions or space constraints to accommodate drilling equipment placement, etc. <br /> DMW-4, DMW-5, DMW-6, DMW-7, DMW-8, DMW-9, and DMW-10 will be advanced using a <br /> sonic drilling rig equipped with 8-inch diameter heavy-walled down-hole casing to a total depth <br /> of 75 feet bgs. During advancement, soil samples will be collected continuously using a 20-foot <br /> core barrel. An attending geologist will log cuttings and sample in accordance with American <br /> Society for Testing and Materials (ASTM) D-2488 — Standard Practice for Description and <br /> Identification of Soils (Visual-Manual Procedure) under the direction of a State of California <br /> Professional Geologist (PG) or Professional Engineer (PE). Soil cores will be screened in the <br /> field for the presence of volatile organic compounds (VOCs) using a photoionization detector <br /> (PID). All down-hole drilling equipment will be decontaminated with high pressure steam <br /> following the completion of each soil boring. Down-hole sampling equipment will be <br /> decontaminated between samples using an Alconox detergent solution and a tap water rinse. <br /> If groundwater is encountered in the B' zone (45-75 feet bgs) a groundwater monitoring well will <br /> be installed within the annulus of the auger. Any monitoring well installed will have ten feet of l <br /> screen to delineate the groundwater encountered in the B' zone (from approximately 55 to 65 <br /> feet bgs) and will be constructed of 2-inch diameter, flush-threaded, schedule 40 PVC well <br /> casing and 0.020-inch factory-slotted well screen. A sand filter pack will be placed in the ' <br /> annular space surrounding the entire screened interval, and will extend approximately three feet <br /> above the screen interval. A two to three foot thick bentonite annular seal will be placed above Al <br /> the filter pack and hydrated. The remainder of the annular space will be filled with neat cement a <br /> and/or grout from the top of the bentonite seal to within 12 inches of the surface. The well will j <br /> be secured with a locking well cap, and completed with a watertight traffic-rated well box <br /> installed at grade. <br /> Task 3 — Laboratory Analyses for Soil <br /> Soil samples will be collected at five foot intervals for possible chemical analyses. Soil samples <br /> selected for chemical analyses will be contained in 2"-diameter by 6"-long brass or stainless <br /> steel sleeves, which will then be sealed on each end with Teflon tape and plastic end caps. The i <br /> soil samples selected for chemical analyses will be based on visual observations and PID <br /> measurements. The selected samples will be placed on ice in an insulated cooler until 1 <br /> relinquished, under documented chain-of-custody control, to a California certified analytical <br /> laboratory. Selected soil samples will be analyzed for GRO — (C6-C12), BTEX, MTBE, di- <br /> isopropyl ether (DIPE), ETBE, TAME, TBA, ethanol, DIPS, 1,2-DCA, and 1,2-dibromoethane <br /> (ethylene dibromide or EDB) by Environmental Protection Agency (EPA) Method 826013, <br /> Task 4—Well Development <br /> Following well installation, the monitoring well seals will be allowed to cure for at least 48 hours <br /> prior to development. Development (to clean the filter pack and stabilize the aquifer materials <br /> 4932 WP for MW Installation 2007.doc SECOR International Incorporated <br />