My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
3500 - Local Oversight Program
>
PR0508502
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2018 7:09:59 PM
Creation date
11/6/2018 3:19:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0508502
PE
3526
FACILITY_ID
FA0008117
FACILITY_NAME
ARCO STATION #4932
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• S E C O R --- _ <br /> Work Plan for Monitoring Well Installation <br /> July 31, 2007 <br /> Former ARCO Service Station No. 4932 <br /> Stockton, California <br /> Page 9 <br /> Task 6 —Surveying <br /> Upon completion of well construction, a licensed surveyor will locate all wells within the <br /> California state plane coordinate system, within 1/1000 vertical control, and latitude-longitude <br /> (degree, minutes, seconds) to meet the State of California Water Resources Control Board <br /> location requirements. The top of the casings of wells located on-site will be surveyed by a <br /> California-licensed land surveyor for horizontal and vertical control. The coordinates will be <br /> referenced to a known benchmark according to the North American Datum of 1983 (NAD83) <br /> and the North American Vertical Datum of 1988 (NAVD88). <br /> REPORTING <br /> Upon completion of the work proposed herein, SECOR will prepare a report summarizing field <br /> activities and analytical results of the investigation. The report will be submitted to Atlantic <br /> Richfield Company, a SP Affiliated Company, and the SJCEHD and will include tabulated field <br /> data, figures depicting subsurface conditions including soil chemical analytical results, <br /> appendices containing laboratory reports, well completion and soil boring logs, copies of field <br /> notes and data sheets, conclusions, and recommendations for further work. Also per AB 2886 <br /> requirements, SECOR will electronically upload the data obtained during this investigation into <br /> the SWRCB Geotracker Database. <br /> SCHEDULE <br /> SECOR is prepared to initiate field activities upon approval of this work plan by the SJCEHD. <br /> SECOR anticipates that fieldwork will require approximately 8 to 10 weeks to complete, <br /> following the receipt of valid well installation permits from SJCEHD. <br /> 4932 WP for MW Installation 2007.doc SECOR International Incorporated <br />