Laserfiche WebLink
SVEIGWE SYSTEM <br /> 4 FIELD MONITORING DATA SHEETS <br /> ' Dale L` (; Time of Arrival <br /> Technician Time of Departure <br /> Site Engineer Rusty Benkosky Was Site Engineer contacted from field? Yes No � <br /> PART A GENERAL INFORMATION <br /> ' Site Local, II <br /> on ARCO 4932 16 Hardin Way.Stockton Project No 7713P 54932 03 0335 <br /> ' Abatement Equip The nTech Vac 50 -500 cfm Thermal/Catalytic Oxidizer Serial No <br /> SVE Blower 20 HP Travini 4Rµnth Choke Max AMP Rating <br /> Tetemetry•NA MAX AMP Rating <br /> ' Electrical Power 230V 3 hase—200 am <br /> Supplemental Fuel 5 psi Natural gas Elect.Meter Reading <br /> No of KIO barrels at site Fut! \ plY <br /> Em Supp Fuel Meter Reading <br /> ' PARTS SVE SYSTEM DATA V / <br /> System up or down upon amval �`/ (If down please complete ART E) <br /> Hourmeter Pleading At time f V <br /> rt i <br /> 01?10 <br /> ) <br /> Flow Data Before Ad ustmenf After Ad ustment Final <br /> %Dilution air Valve open �-- <br /> K/O Content al <br /> ' Vacuum @ blower <br /> Gauge Range <br /> AMPS drawn by blower motor AMPS <br /> Total System Flow(A P,in H20) <br /> Pipe Size 7 9- <br /> Well Field Air Flow(A P.in H2O) -J <br /> Pope Slze el <br /> Dilution Air Flow(A P,`H2O) <br /> tPi SEze <br /> II} <br /> FID Data <br /> ' System Influent my ell Field <br /> SyEtem influent my)(Alr StrinnerlO <br /> ' S tem Effluent my D <br /> Field Instrument Used Last Calibrated <br /> Completed By Date <br /> i <br />