Laserfiche WebLink
SVEIGWE SYSTEM <br />! FIELD MONITORING DATA SHEETS <br /> Date 1 G ' Time of Arrival <br /> Technician Time of Departure <br /> Site Engineer Rus Benkosk Was Site Engineer contacted from field? Yes No <br /> PART A GENERAL INFORMATION <br /> i <br /> Sate Location ARCO 4932 16 Harding Way,Stockton Project No 77BP 54932 03 0335 <br /> Abatement Equip ThermTech Vac 50 -500 cfm Thermal/Catallytic Oxidizer Serial No <br /> SVE Blower 20 HP Travini 4R wlth Choke Max AMP Rating <br /> i <br /> Telemetry N MAX AMP Rating <br /> Electrical Power 230V 3 phase–200 am <br /> Supplemental Fuel. sl Natural as ElectMeter Reading <br /> _ <br /> No of K/O bagels at site Full- Empty Supp Fuel Meter Reading <br /> i <br /> i <br /> ' PART S.SVE SYSTEM DATA n <br /> System up or down upon amval t� ` (If down please complete PART E) <br /> Hourmeter Reading _.j 5 v At lime l r r I <br /> �1) <br /> Flow Data Before Ad ustment After Adjustment Final <br /> ' %DIlubW air valve open <br /> WO Content al v <br /> Vacuum QRa {la H;� <br /> ower rGaM <br /> ' nge <br /> AMPS drawn U blowier motor AMPS <br /> Total System Flow(A P.in HZO) <br /> ' <br /> pipe Size 4 <br /> Well Field Air Flow(A P.in H2O) !� <br /> Pa Size t9 O 7 <br /> - <br /> Dilution Air Flow(a P.`H20) <br /> Pipe Size 4Q <br />' li) <br /> FID Data <br /> S tem Influent my ell Field 9 -b <br /> System Influent my)(AIr Stri r <br /> ' Sy§tem Effluent my) U v <br /> Field Instrument Used / Last Calibrated <br /> i <br /> i <br /> ompleted By Date <br /> v <br /> �l� <br />