Laserfiche WebLink
SECOR International Incorporated <br /> HYDROLOGIC DATA SHEET <br /> Gauge Date March , 2005 Project Name ARCO 4932 Stockton, CA <br /> Field Technician Peng Vang Project Number 77BP 54932 04 0327 <br /> TOC-Top of Well Casing Elevation DIA=Well Casing Diameter <br /> DTP-Depth to Free Product(FP or NAPH)Below TOC ELEV a Groundwater Elevation <br /> DTW=Depth to Groundwater Below TOC DUP-Duplicate <br /> DTB a Depth to Bottom of Well Casing Below TOC <br /> WELL.OR PURGE & SHEEN <br /> LOCATION TIME MEASUREMENT SAMPLE CONFIRMATION COMMENTS <br /> TOC DTP DTW DTB DIA ELEV 1Q057 (wlbailer) <br /> DMW-3 30 31 82 2 Yes <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 1 of 1 <br />