My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0002732
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
3500 - Local Oversight Program
>
PR0508502
>
ARCHIVED REPORTS XR0002732
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 3:32:31 AM
Creation date
11/6/2018 3:25:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002732
RECORD_ID
PR0508502
PE
3526
FACILITY_ID
FA0008117
FACILITY_NAME
ARCO STATION #4932
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SVEIGWE SYSTEM <br /> FIELD MONITORING DATA SHEETS <br /> t, <br /> Date r�'� Time of Amval <br /> Technioan Time of Departure <br /> Site Engineer Rusty Benkoskv Was Site Engineer contacted from field? Yes No <br /> PART GENERAL INFORMATION <br /> Site Location ARCO 4932, 46 Harding Way,Stockton Project No 77BP 54932 03 0335 <br /> Abatement Equip ThermTech Vac 50 -500 cfm Thermal/Catalytic Oxidizer Serial No <br /> SVE Blower 20 HP Travini 4R with Choke Max AMP Rating <br /> Telemetry NA MAX AMP Rating <br /> Electrical Power 230V 3 phase–200 am <br /> Supplemental Fuel 5 psi Natural gas Elect Meter Reading <br /> Supp Fuel Meter Reading <br /> No of WO barrels at site �, Full Empty <br /> PARTS SVE SYSTEM DATA <br /> System up or down upon arrival (If down please complete PART E) <br /> Houmteter Reading _ At tame <br /> i} <br /> Flow Data Before Adjustment— After Adjustment Final <br /> %Dilution air valve open <br /> WO Content al " <br /> Vacuum Q blower ftrt-+Q% <br /> Gauge Ra e 7 <br /> AMPS drawn by blower motor AMPS /- <br /> Total System Flow(A P.in H2O) U '7 z1 <br /> P Size o� 7 Cl <br /> Well SI r Flow(A P,in H2O) <br /> Dize 6 <br /> ilution Air Flow(A P.'H2O) <br /> Pipe Size <br /> iE) <br /> FID Data <br /> Sy§tem Influent my ell Field)_ �p {� <br /> System Influent my Air Stripr ,t.) <br /> System Effluent my 6 <br /> Field Instrument Used Last Calibrated <br /> Completed By Date G <br />
The URL can be used to link to this page
Your browser does not support the video tag.