My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0002734
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
3500 - Local Oversight Program
>
PR0508502
>
ARCHIVED REPORTS XR0002734
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2020 10:27:11 AM
Creation date
11/6/2018 3:27:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002734
RECORD_ID
PR0508502
PE
3526
FACILITY_ID
FA0008117
FACILITY_NAME
ARCO STATION #4932
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S E C o R <br /> Groundwater Batch Extraction <br /> Batch groundwater extraction was initiated in March 2002 and consisted of extracting groundwater from <br /> on-site wells MW-1, MW4, MW-6, and EW-1 with a vacuum truck Batch extraction was performed <br /> twice a month until the construction of the permanent remedial system was initiated in November 2002 <br /> Batch extraction was re-started in September 2003 as an interim remedial approach to reduce petroleum <br /> hydrocarbon concentrations in off-site extraction wells, and for controlling further off-site migration of the <br /> dissolved plume plume pending connection of offsite extraction wells to the on-site SVE/GWE system <br /> Offsite extraction wells EW-2, EW-3, EW-4, EW-5, and EW-7 are pumped on a weekly basis, and the <br /> water is treated through the on-site GWE system Thirteen batch extraction events were conducted <br /> during the first quarter 2004, which resulted in the removal of 16,700 gallons from the off-site extraction <br /> wells <br /> Conclusion <br /> Operation and maintenance of the SVE/GWE system will continue during the second quarter 2004 <br /> Weekly batch extraction events from wells EW-2, EW-3, EW-4, EW-5, and EW-7 will continue until <br /> the installation of the offsite remedial system proposed in the revised interim remedial action plan <br /> (TRAP) <br /> Attachments Table A-1 - Dual Phase Extraction System —Sod Vapor Extraction <br /> Performance Data <br /> Table A-2 - Dual Phase Extraction System —Sod Vapor Emission Data <br /> Table A-3 - Dual Phase Extraction System —Groundwater Extraction <br /> Performance Data <br /> Table A-4 - Dual Phase Extraction System —Groundwater Treatment <br /> Effluent Data <br /> - <br /> Figure A-1 Dual Phase Extraction System —Soil Vapor Mass Removal <br /> Trend <br /> Figure A-2 - Dual Phase Extraction System —Soil Vapor Hydrocarbon <br /> Concentrations <br /> Figure A-3 - Dual Phase Extraction System —Groundwater Mass <br /> Removal Trend <br /> Figure A-4 - Dual Phase Extraction System —Groundwater Hydrocarbon <br /> Concentrations <br /> Attachment A-A Batch Extraction and Remediation System Field Data <br /> Sheets, Remediation System Certified Laboratory Analytical <br /> Reports, and Chain-of-Custody Documentation <br />
The URL can be used to link to this page
Your browser does not support the video tag.