Laserfiche WebLink
TABLE 4 <br /> BATCH EXTRACTION-TOTAL GROUNDWATER VOLUME REMOVED <br /> ARCO Service Station#4932 <br /> 16 East Harding Way <br /> Stockton,California <br /> Date Volume Removed Wells <br /> (gallons) Pumped <br /> 03/18/02 2,500 MW-1, MW-4, SVE-1, EW-1 <br /> 4/3/2002(aquifer test) 6,300 EW-1 <br /> 04/19/02 1,800 MW-1, MW-4, EW-1 <br /> 04/29/02 1,500 MW-1, MW-4, SVE-1, EW-1 <br /> 05/13/02 1,700 MW-1, MW-4, MW-6, EW-1 <br /> 05/30/02 1,800 MW-1, MW-4, MW-6, EW-1 <br /> 06/21/02 1,700 MW-1, MW-4, EW-1 <br /> 07/03/02 1,500 MW-1, MW-4, EW-1 <br /> 07/18/02 2,250 MW-1, MW-6, EW-1 <br /> 08/02/02 2,300 MW-1, MW-4, MW-6, EW-1, EW-2 <br /> 08/12/02 3,180 MW-1, MW-4, MW-6, EW-1, EW-2 <br /> 08/29/02 1,600 MW-1, MW-4, MW-6, EW-1, EW-2 <br /> 09/11/02 1,900 MW-1, MW-4, MW-6, EW-1, EW-2 <br /> 10/01/02 2,490 MW-1, MW-4, EW-1, EW-2 <br /> 10/21/02 1,000 MW-1, MW-4, EW-1 <br /> Total: 33,520 <br /> Batch Ex GW elevation.xls Page 1 of 1 <br />