Laserfiche WebLink
1g1o����o <br /> 5,. Y vENU� <br /> 2LvC* " SpERR A LEGEND: <br /> + SHALLOW <br /> WELL OGATIONNDWATER MONITORING <br /> r <br /> 0 Mw 11 SOIL VAPOR EXTRACTION WELL LOCATION <br /> 73 • SOIL BORING LOCATION <br /> 1 D IPHg <50 sver Q DEEP GROUNDWATER MONITORING WELL <br /> O B <0.509AD0 <br /> OFFICEBuILDING 1 P.R E <2.5/<0.50 io + GROUNDWATER EXTRACTION WELL <br /> x525 EL DORADO STTEET 113ik <br /> M. AREA OF OVER-EXCAVATION DURING 1999 <br /> 1 TPHg « 1.—I UPGRADE ACTIVITIES <br /> 8 <0.50 (NS) NOT SAMPLED <br /> mg 2,5010 MWE M1<2.0 <br /> Mtn Kq/<2.0 0 POWER POLE <br /> ALLEY B 2M 600 ow OVERHEAD POWER LINES <br /> MW-10 Tft <50 s Mw-2 +VIBE W<1.0 <br /> B <0 50FORM GETSTA" 7PHg <50 <br /> o� 1 MtBE 1�/<2o 0 Q 51OST <br /> Kw FL OSAD Mw-8 B <0.50 CHEMICAL ANALYTICAL RESULTS: <br /> p FORK MtBE Afq/J1 ANALYTE <br /> 9 t► g 3 Q r, �4 « <br /> <50 1 Tft <br /> AIWE M V<2. yQos>< �4 <50 <br /> MBE <2.5/<0.50 TACO 0 8 Z2 10 B 1050 8 <0.50 CONCENTRATION{ug/L) <br /> BEII MW-3 AItBE Af4/<2.0 AIEE <?5/<0.50 <br /> MW-7 <br /> Mw_ <br /> 1 TPHg 30,000 TPNg <50 003N) ANALYTES: <br /> 8 <200 B <0.50 1 p AY 7PHg TOTAL PETROLEUM HYDROCARBONS <br /> MtBE 42,000/57,000 MtBE 14/16bAS GASOLINE <br /> g <br /> 2,200 <br /> 7PH9 <50 7Pyg <50 7PHg 2,500 8 200 B BENZENE <br /> 8 <0.50 B <0.50 8 16 ACBE AK/<2 (BY EPA METTHHBUTYLETHER <br /> 0 MtBE METHYLTE <br /> 7PHg 260 kWE 41/64 DMW-3 MtBE WV2.7 MWE NAI<Zp OD 802018260) <br /> (NS) NOT SURVEYED <br /> B 8.J <br /> MW-6MtBE 4.1/6.J DMW 2 Ew 2 NOTE: TOSCO WELLS SAMPLED ON NOVEMBER 14 <br /> _7 TPHg 45,000 2002 AND ARCO WELLS SAMPLED ON <br /> B <1010 NOVEMBER 20.2002. <br /> MtSE 71,000/90,000 ! <br /> 7PHg 28,000 H <br /> ARG*NG <br /> WAY T" <50 <br /> B J90 B, <0.50 <br /> MBE 440/280MtBE .1v5/J1 <br /> DRQ MW5 <br /> • <br /> TPHg 810 EW-1 ) UWg <50 <br /> B 56 MP � B 0.76 <br /> ANW 66/1.4 DR' 1 1 - 1 � DMW-1 MW 18/21 <br /> MW <br /> SVE-1 MHg 1,600 u <br /> gy 3 (D l MW-1 8 31 n <br /> AC MtBE 1,40D/1,600 <br /> C7 PUMP PAVING <br /> C AC ISLAND 7PHg 140,0100 <br /> u PAYING a amo <br /> z M1BE 58,000/67,000 <br /> 01 0 BUILDING <br /> V z. <br /> MW 9 A 1f rl PAVING {1 <br /> 0 60 12 <br /> FORMERAND APPROXIMATE SCALE FEET <br /> 2. f Tl EX1S7ING UST$ <br /> '1 >� 01.775 C11 15 a js MW-2 s8, <br /> MSE <2.5/<0.50 mj Lt s j <br /> DRAWN <br /> � <5` REFERENCE: APMPR FIGURE 3 <br /> MOL <2.50 .66 TOSCO SITE IS BASED ON ON A'SITE S EC OR CH ARCO SERVICE STATION#4932 <br /> TPNg 1,000 PLAN'PROVIDED BY IT CORPORATION, I is EAST HARDIN4 WAY <br /> AND IS INTENDED FOR ILLUSTRATION International DATE <br /> 04APR2002 <br /> MtBE 920/1,000 ONLY,ARCO SITE SURVEYED BY I„nN$ MORROW SURVEYING. Incorporated �� �;GROUNDWATER CHEMICAL CONCENTRATION MAP <br /> g 77BP.54932.02 NOVEMBER 14 &20, 2002 <br />