Laserfiche WebLink
LEGEND <br /> M277 Q DEEP GROUNDWATER MONITORING <br /> WELL <br /> aCICE Rul STFjEET <br /> ` r 1 <br /> ,may Tt.Oar�� ,� � GROUNDWATER EXTRACTION WELL <br /> �1 1 SHALLOW <br /> GROUNDWATER MONITORING <br /> F= WEL <br /> Q � 0� gA0a � SOIL VAPOR EXTRACTION WELL <br /> • SOIL BORING <br /> ALLEY <br /> MW 10 � �—~ ` — { AREA OF OVER-EXCAVATION DURING 1999 <br /> Ian_ , 1 FoF MW 2 I — UPGRADE ACTIVITIES <br /> o <br /> O e o O �RMEl ST <br /> noN mi <br /> i G POWER POLEvIG9aa5T d <br /> I F °" <br /> mw-8 <br /> w-i O poiWER ppq oFrE OVERHEAD POWER LINES <br /> tisk <br /> MW 10 wosK -1 7 5 GROUNDWATER ELEVATION CONTOUR <br /> O ® W-3 (FEET ABOVE MEAN SEA LEVEL) <br /> MW 7 (-1740) GROUNDWATER ELEVATION <br /> 09 �{ (FEET ABOVE MEAN SEA LEVEL) <br /> Z W-4 + 4 <br /> NOT MEASURED <br /> DEEP DFIV�'fAY { <br /> CONTOURING MONITORING WELLS NOT USED IN <br /> ,enl t7 <br /> MW-7 DMW-2* �I <br /> nsag <br /> HARE)' <br /> � <br /> Fw 1 #A <br /> a r ra <br /> RNA MW{ <br /> Frravl i <br /> 0 <br /> r <br /> ppIVE p <br /> SVE 1 A ' � 7 Dmw 1* 17 <br /> N nay -176 <br /> 3 Fraas� Mw I <br /> AC } <br /> Qm AMNO <br /> ACLA UD 'rT <br /> PAVING <br /> n n <br /> t <br /> Z 9UlLD1M0 AC <br /> mw-9 PAVING <br /> R L} y REFERENCE TOSCO SITE IS BASED O ON A'SITE Rfr' <br /> PLAN'PROVIDED BY IT CORPORATION 0 60 120 <br /> N <br /> LTJ ONLY ARCO WEIS LLS FO <br /> R <br /> B ON r y� <br /> �¢ Ti1 ti I M1N 2 SB 1 MORROW SURVEYING APPROXIMATE SCALE FEET <br /> DMWN <br /> PR <br /> FIGURE 12 <br /> SECOR Am CH ARCO SERVICE STATION#4932 <br /> MW-8 Intern atR,onal DATE 10 EAST HMI)ING WAY <br /> w Inc 04►4PR2002 <br /> STOCKTON CALIFORNIA <br /> Incorporated JW NO I GROUNDWATER ELEVATION CONTOUR MAP <br /> 77BP 5493200 1, AFTER BATCH EXTRACTION -JULY 18, 2002 <br />