Laserfiche WebLink
Mw], <br /> LEGEND <br /> O DEEP GROUNDWATER MONITORING <br /> OMCE- WELL <br /> 1525 EL oCRADO STpCET , GROUNDWATER EXTRACTION WELL <br /> i <br /> SHALLOW GROUNDWATER MONITORING <br /> 5 WELL LOCATION <br /> AL SOIL VAPOR EXTRACTION WELL <br /> EYE SOIL BORING <br /> ALL <br /> 10 "' — I AREA OF OVER-EXCAVATION DURING 1999 <br /> (re3e1 �-- –� Tr stns C6 MW 2 I -_ UPGRADE ACTIVITIES <br /> CJ R TDA-nO <br /> O a M sE AGE 6 ��ST POWER POLE <br /> `S 4 OHE OVERHEAD POWER LINES <br /> r <br /> 1 m � <br /> raco � ml -,n YsaSK °'�A°'E"'ra� APPROXIMATE GROUNDWATER FLOW <br /> a>�u- "� a f""� MW-3 DIRECTION AND GRADIENT FT/FT <br /> e , + fNWr 75_ GROUNDWATER ELEVATION CONTOUR <br /> WW-4om ff� -18 (FEET ABOVE MEAN SEA LEVEL) <br /> , oal <br /> AY <br /> CP GROUNDWATER ELEVATION <br /> 1B ) (FEET ABOVE MEAN SEA LEVEL) <br /> pfllYFS`IAY <br /> (NM) NOT MEASURED <br /> ODMW-3 * DEEP <br /> MONITORING WELLS NOT USED IN <br /> Mw-e ' <br /> CONTOMW-7 D 2' -2 <br /> f as2n Frsaq <br /> �1P <br /> HARE) NG WAY <br /> C4 <br /> FS DRIVE f <br /> Mw5 <br /> r <br /> EW-1*S&2 hl <br /> DRIVF hiP +F-M-04) 0 <br /> C (to am f DMW 1 <br /> cc MW- <br /> 0 f 3 1-17M ! � 8� <br /> � <br /> PA� PAYING <br /> � � r PUfufP <br /> ISLAND ` <br /> tr <br /> CV PAVING <br /> co <br /> m rn BUILDING <br /> rr' <br /> Mw-s + m � <br /> PLAN 1 <br /> 3 FAWNG REFERENCE TOSCO SITE IS BASED ON ON A-SrrE <br /> 0 60 TECORPORATION, 12022071rGlSDrs AND INTENDED FOR ILLUSTRATION <br /> ONLY ARCO WELLS SURVEYED BY <br /> oLy�� MW-2 5&, MORROW SURVEYING APPROMMATE SCALE FEET <br /> MAWN <br /> PR FIGURE 17 <br /> sECOR I _ <br /> CH ARCO SERVICE STATION#49Gi2 <br /> Mw a International DATE 10 EAST N II)I G WAY <br /> 04APR2002 F <br /> $ <br /> Incorporated ANO GROUNDWATER ELEVATION CONTOUR MAP <br /> 77BP 54932 OO BEFORE BATCH EXTRACTION -AUGUST 29, 2002 <br />