Laserfiche WebLink
WORK REQUEST FORM <br /> JOB NAME ARCO 4932 JOB NUMBER 77 BP 54932 01 0001 <br /> SITE ADDRESS 16 E Harding Way START DATE 18-Jul ' <br /> Stockton, CA 8 00 AM <br /> PREPARED FOR Rudy PREPARED BY Clinton Harms <br /> NOTE <br /> 1 Conduct Health and Safety Meeting Make sure ARCO/BP Passport guidelines are meet <br /> 2 Arrive onsite approximately 1 hour prior to Dillard Environmental <br /> Gauge all wells on hydro data sheet pnorto pumping <br /> Gauge wells SVE-1, MW-4, and EW-1 for SPH <br /> 3 Supervise Dillard Environmental during the batch extraction of groundwater from wells__ <br /> MW-1, MW-4, EW-1, and SVE-1 Note the number of gallons purged <br /> 4 Use sampling truck to pump water from wells EW-2 and MW-6 Have Dillard vac out <br /> water from the sampling truck Note the number of gallons purged <br /> 5 Have Dillard vac out any drums_of water onsite Remove those drums Inventory any <br /> waste on site <br /> 6 Gauge all wells on hydro data sheet after pumping is complete <br /> } DM&Rp 06 pqw- kbaq s <br /> O $ <br /> OleA = ,a� Ad4�P - <br /> + 6 , <br /> O L /719 <br /> CU- OU <br /> [ANALYTICAL,RE li U1AEIf W � <br /> �+ <br /> IP <br /> no sampling HASP <br /> Safety a ui ment baracades, snow fence, <br /> personal protective equip) <br /> AUTHORIZATION COMPLETED4�7 <br />