Laserfiche WebLink
i <br /> 1����0� �✓' �RRY A��NU� <br /> y �P <br /> Mw 11 <br /> Dff10E BUILDING 1 <br /> 1525 EL DORAP(7 STV,,T <br /> Q , I <br /> © iA G Sr�6F� <br /> iPAO <br /> t 1520 <br /> ALLEY � :rte----aw <br /> � p <br /> Mw 10+ pf{ m t+ fo5G0 mw 2 <br /> FORMER AT ON <br /> FOC 00 S7 ( ) <br /> i iul 1�j 1502 EI DOS mw-8 I <br /> L FOtRIA <br /> MW 10 yt06K mw-6 <br /> m\N 3 <br /> (AIS) <br /> M\N 7 <br /> MW 4 MW 9 <br /> i <br /> t, (a) + DFi1VE�^IAY <br /> i <br /> pR1VE�AY <br />� r <br /> i I <br /> i <br /> EW 2 BMW <br /> I <br /> oft MW-6 <o50) I <br /> Mw 7LEGEND <br /> / I I <br /> SHALLOW GROUNDWATER MONITORING WELL LOCATION <br /> A SOIL VAPOR EXTRACTION WELL LOCATION <br /> } <br /> WAY I 0 SOIL BORING LOCATION <br /> 0AFlpING U DEEP GROUNDWATER MONITORING WELL <br /> a <br /> Mw 5 GROUNDWATER EXTRACTION WELL <br /> AREA OF OVER-EXCAVATION DURING 1999 <br /> °PNE ��� E {�03pj + I I UPGRADE ACTIVITIES <br /> rsr a <br /> SVL 1 A MW-4 O POWER POLE <br /> 3 M3 1 Mw 1 oxE OVERHEAD POWER LINES <br /> AC <br /> pu1�I5 PAVINGI <O 50— BENZENE ISOCONCENTRATION CONTOUR <br /> ISLAND w PAVING (<0 50) BENZENE CONCENTRATION(�tglL) <br /> wsuriflruC (NS) NOT SAMPLED <br /> z <br /> Lu <br /> Mw,9 + m nn O so 12D <br /> w J3 PAVING <br /> 1p <br /> M T4 � FORMERAND APPROXIMATE SCALE FEET <br /> Cl) ; s �� 4 J EXISTING LISTS <br /> i Y <br /> l ; it , Mw sBr I <br /> DRAWN PR FIGURE 10 <br /> ARCO SERVICE STATION#4932 <br /> O REFERENCE TOSCO SITE IS BASED ON ON A"SITE S EC OR A PR CH 18 EAST HARDING WAY <br /> PLAN"PROVIDED BY IT CORPORATION DATE STOCKTON CALIFORNIA <br /> AND IS INTENDED FOR ILLUSTRATION International <br /> MORS SIE SURVEYED BY 04APR2002 BENZENE ISOCONCENTRATION CONTOUR MAP <br /> mwo VIN <br /> Incorporated JOB NO DEEP WATER BEARING ZONE <br /> a 77BP 54932 00 JULY 12, 2002 <br />