Laserfiche WebLink
SVEIGWE SYSTEM <br /> FIELD MONITORING DATA SHEETS <br /> Date t 1`11�`� Time of Arrival <br /> Technician Dlv- Time of Departure <br /> Site Engineer, Rusty Benkosky Was Site Engineer contacted from field? Yes No <br /> PART A GENERAL INFORMATION <br /> Site Location ARCO 4932, 16 Harding Way,Stockton Project No 77BP 54932 03 0335 <br /> Abatement Equip ThermTech Vac 50 -500 cfm Thermal/Catalytic Oxidizer Serial No <br /> SVE Blower Max AMP Rating <br /> Telemetry MAX AMP Rating <br /> Electrical Power 230V 3 phase-200 am <br /> Elect Meter Reading <br /> Supplemental Fuel 5 psi Natural-gas <br /> Supp Fuel Meter Reading <br /> No of K/O barrels at site Full Empty <br /> PART B SVE SYSTEM DATA tt ( I,� ;r A I f_ 1-z <br /> c <br /> System up or down upon arrival V (If down please complete PART E) <br /> Hourmeter Reading 7-3z At time <br /> I) <br /> Flow Data Before Adjustment After Ad ustment Final <br /> %Ditubon air valve open <br /> KIO Content al —' �` - <br /> Vacuum @ blower4Wrl 12Cer ,/ f <br /> Gauge Range dIY.�` 'tiF r �J C� li��/1NrFdc� <br /> S <br /> Total System Flow(e P,in H20) <br /> Plpq Size 0 <br /> Well Field Air Flow(e P.In H2O) o A <br /> Pipe Size ( Ir 176 <br /> 7 <br /> Dilution Air Flow(A P,"H2O) <br /> Pipe Size <br /> Ii) <br /> FID Data <br /> (O <br /> System Influent my ell Field U d ! �' U <br /> System Influent my Air Stripper) �3 ' 13 'Z <br /> System Effluent my 'C� 0 6 <br /> Feld Instrument Used Last Calibrated <br /> • <br /> Completed By Date <br />