Laserfiche WebLink
PART C ABATEMENT EQUIPMENT DATA <br /> THERMAL.OXIDIZER Before Adjustment Final <br /> Mode Thermal <br /> Oxidizer Setpoint(OF) AI ill <br /> Inlet Temperature °F <br /> High Temp Set ant °F l6Da <br /> Auto Dilution Set Point -50 <br /> Exhaust Tem erature °F f1/JT Al <br /> PART D GWE SYSTEM DATA 1�r <br /> Effluent Totalizer Reading At time <br /> Please Note The Flow Totalizer was calibrated on 5/29103 and Is Penodically cleaned to remove mineral scale <br /> System Data Before Adjustment— Final <br /> Bag Filter Inlet/Outiet Pressures(psi) 5' 3 <br /> • Carbon Vessel G1 (psi) J <br /> Carton Vessel G2(psi) <br /> Carbon Vessel G3(psi) <br /> Air Stdpper System Data Before Ad ustment Final <br /> Vacuum at Air Stripper H207 <br /> Air Sbipper Flow rate <br /> Alr SbipMr Valve Setting �Q <br /> Air Stripper FID Data <br /> Air StHpper Effluent my <br /> Field Instrument Used Last Calibrated <br /> Art- 7 rtel urs �j�9 c � 3J <br /> I ! <br />