Laserfiche WebLink
�v <br />10) <br />• <br />offsite extraction wells to the onsite remedial system Offsite extraction wells EW -2, EW -3, EW -4, EW -5, <br />and EW -7 will be pumped on a weekly basis and the water will be treated through the GWE system <br />onsite Two batch extraction events were conducted during the third quarter resulting in the extraction of <br />3,470 gallons from offsite wells <br />Conclusion <br />Operation and maintenance of the SVEIGWE system will continue during the fourth quarter 2003 <br />Expansion of the GWE system to include offsite well EW -2, EW -3, EW -4, EW -5, and EW -7 is being <br />completed pending gaining access to the Taco Bell property north of the ARCO Station Batch <br />extraction events from offsite wells will continue until the offsite extraction wells are connected to the <br />GWE system <br />Attachments Table A-1 - <br />Table A-2 - <br />Table A-3 - <br />Table A-4 <br />Figure A-1 - <br />Figure A-2 - <br />Attachment A -A <br />Soil Vapor Extraction System Performance Data <br />Sod Vapor Extraction System Emission Data <br />Groundwater Extraction System Performance Data <br />Batch Extraction Removal Data <br />Soil Vapor Extraction System Mass Removal Trend <br />Soil Vapor Extraction System Hydrocarbon Concentrations <br />Remedial System and Batch Extraction Data Sheets and <br />Laboratory Analytical Data <br />