My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0002745
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
3500 - Local Oversight Program
>
PR0508502
>
ARCHIVED REPORTS XR0002745
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2018 8:52:17 AM
Creation date
11/6/2018 3:34:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002745
RECORD_ID
PR0508502
PE
3526
FACILITY_ID
FA0008117
FACILITY_NAME
ARCO STATION #4932
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. SUPPLEMENTAL CONDITIONS <br /> FOR ENCROACHMENT PERMIT NO. 67916 <br /> I <br /> The following are included as part of the conditions for approval of Encroachment Permit no 67916 <br /> 1 One lane shall remain open and accessible to traffic in each direction at all times <br /> 2 No lane closures prior to 9 00 am and all lanes must be reopened by 4 00 pm <br /> 3 All intersections shall remain open, and accessible to traffic in each direction at all <br /> times <br /> 4 All traffic control shall conform to the Caltrans Traffic Control Manual, Including the <br /> use of a lighted arrow board <br /> 5 Remove all USA markings associated with this work <br /> 6 At the expense of the permittee, one compaction test, to be analyzed by a certified <br /> independent laboratory, is required every 100 feet of trench per 2 feet of lift, or as <br /> directed by the Public Works inspector <br /> 7 All trenching, backfill and paving shall conform to City of Stockton Standard <br /> • Drawings 50, 50A and 50B Pavement section shall be equivalent to the existing <br /> depth, but in no case less than 13 inches on Harding Way <br /> 8 The use of control density backfill material(CDF)is required for all trenches eight(8) <br /> inches or less and shall be restricted to the use of structural controlled densityfill per <br /> City of Stockton standard specification 19-3 066 The CDF mix design shall be <br /> submitted to the Public Works Department for review and approval prior to <br /> placement <br /> Failure to comply with the above conditions shall cause this permit to be immediately revoked <br /> Revocation notice may be by verbal notification by an authorized representative of the Public Works <br /> Director r by ntt correspondence <br /> GEO R MONTROSS <br /> ASSISTANT ENGINEER <br />
The URL can be used to link to this page
Your browser does not support the video tag.