My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0002745
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
3500 - Local Oversight Program
>
PR0508502
>
ARCHIVED REPORTS XR0002745
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2018 8:52:17 AM
Creation date
11/6/2018 3:34:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002745
RECORD_ID
PR0508502
PE
3526
FACILITY_ID
FA0008117
FACILITY_NAME
ARCO STATION #4932
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S1 it <br /> E C 0 R <br /> Atlantic Richfield Company <br /> ARCO Service Station 4932 <br /> September 22, 2003 <br /> Page 6 <br /> Expansion of the remedial well network to Include offsite wells EW-2, EW-3, EW-4, EW-5, and EW-7 <br /> Is expected to be completed by November of 2003 Revocable and building permits through the City <br /> of Stockton have been issued for completing extension of the remedial system to offsite wells <br /> Currently, Atlantic Richfield Company Is awaiting access to the adjacent Taco Bell property to the <br /> north to complete a horizontal boring beneath Harding Way When access to the property is granted, <br /> extension of the remedial system to offsite wells will be completed Weekly Interim groundwater <br /> remediation in offsite wells EW-2, EW-3, EW-4, EW-5, and EW-7 by batch extraction with a vacuum <br /> truck will be Implemented during the week of September 22, 2003 and will be conducted until the <br /> expansion of the remedial system is completed <br /> If there are any questions, please call us at (916) 861-0400 <br /> Sincerely, - <br /> SECOR International, Incorporated <br /> 1-95OQp,OFESs�� <br /> 411 07 Z94 ��Q�S� 4�N'�0`�_' <br /> Clinton Harms NO C p$839�� m <br /> Project Scientist <br /> Bqenkosky, <br /> oF ca�.�4us y table <br /> Senior Engineer <br /> Attachments Well Construction Details <br /> Table 2—Soil Analytical Results <br /> Table 3—Groundwater Analytical Results <br /> Table 4—Soil Analytical Results—Stockpiled Soil <br /> Table 5—Soil Vapor Extraction System Performance Data <br /> Table 6—Groundwater Extraction System Performance Data <br /> Figure 1 —Site Location Map <br /> Figure 2—Aerial Site Plan <br /> Attachment 1 —SJC EHD Letter dated November 7, 2002 <br /> Attachment 2— Permits <br /> Attachment 3— Field and Laboratory Procedures <br /> Attachment 4— Boring Logs <br /> Attachment 5— Certified Laboratory Analytical Reports and Chain-of-Custody <br /> Documentation (Soil) <br /> Attachment 6—Well Development Sheets, Certified Laboratory Analytical Report, <br /> and Chain-of-Custody Documentation (Groundwater) <br /> r <br /> cc Mr Paul Supple, Atlantic Richfield Companyk� <br /> v <br /> i 1ARC0149321Reportslrernedial well start up doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.