Laserfiche WebLink
Ai Li <br /> SVEIGWE SYSTEM <br /> i� FIELD MONITORING DATA SHEETS <br /> Date C� Time of Arrival <br /> Technician Time of Departure <br /> Site Engineer Rusty Benkosky Was Site Engineer contacted from field' Yes No <br /> PART A GENERAL INFORMATION <br /> Site Location TARCO 4932, 16 Harding Way,Stockton Project No 77BP 54932 03 0335 <br /> Abatement Equip ThermTechVac 50 -500 cfm Thermal/Catalytic Oxidizer Serial No <br /> SVE Blower Z,U WIf -.7AU,r/1 Max AMP Rating <br /> Telemetry MAX AMP Rating <br /> Electrical Power 230V 3 phase—200 amp <br /> Supplemental Fuel 5 psi Natural gas T Elect Meter Reading <br /> No of K/O barrels at site Full Empty Supp Fuel Meter Reading <br /> PART B SVE SYSTEM DATA <br /> System up or down upon arrival (if down please complete PART E) <br /> Hourmeter Reading O o 0 Q l O At time I — Do _ <br /> Flow Data Before Ad ustment After Adjustment Final <br /> %Dilution air valve open <br /> K/O Content(cal) ��- <br /> Vacuum ® blower(in H2O) <br /> Gauge Range <br /> AMPS drawn by blower motor AMPS <br /> Total System Flow(A P,in HzO) <br /> PIP2 Size <br /> Well Field Air Flow(A P,in H2O) <br /> Pipe Size <br /> Dilution Air Flow(A P,'H2O) <br /> Pipe Size �/ <br /> II) _ <br /> FI D Data <br /> System Influent my Well Field UT /'r��AA <br /> 1 <br /> System Influent my Air Stripper <br /> System Effluent my <br /> Field Instrument Used Last Calibrated <br /> Irl 0� Cw - Aad M w 1 <br /> Completed By Date. <br />