Laserfiche WebLink
SVEIGWE SYSTEM <br /> • FIELD MONITORING DATA SHEETS <br /> Date V G 3 Time of Arrival_9, O V e'`l <br /> Technician ` Z--ATime of Departure <br /> Site Engineer Rusty Benkoskv Was Site Engineer contacted from field? Yes No <br /> PART A,GENERAL INFORMATION <br /> Site Location ARCO 4932 16 Harding Way,Stockton Project No 77BP 54932 03 0335 <br /> Abatement Equip ThermTech_Vac 50 -5040 cfm Thermal/Catalytic Oxidizer 4 Serial No <br /> SVE Blower —T— V%tA k L. Y L- Max AMP Rating <br /> Telemetry ._._ . MAX AMP Rating <br /> Electrical Power 230V 3 phase--200 am <br /> Supplemental Fuel 5 psi Natural gas _ Elect Meter Reading <br /> Supp Fuel Meter Reading <br /> No of WO barrels at site � Full Empty <br /> PART B SVE SYSTEM DATA , �p <br /> System up or down upon am �vai O ��"� (if down please complete PART E) <br /> Hourmeter Reading 2 (} At time 9,00 <br /> i) <br /> Flow Data Before Adjustment After Adjustment Final <br /> %Dilution air valve op2n a0 <br /> K10 Content al y <br /> Vacuum @ blower(in H2O) <br /> Gauge Range �2 o, O <br /> AMPS drawn bX blower motor AMPS <br /> Total System Flow(A P.in H2O) W k 01 L JS - Q <br /> PI Size l <br /> Weil Field Air Flow(A P,in H2O) <br /> Pl Size 0 J 1--, /3 7, p <br /> Dilution Air Flow(A P,"H2O) <br /> Pipe Size , d <br /> II) <br /> FID Data <br /> System Influent my Mill Field , O <br /> System Influent my Air Stripper) Z la.U <br /> Svstem Effluent my ! . <br /> Field Instrument <br /> Used Fla Last Calibrated kil 4 0 <br /> ti <br /> Completed By: Date: <br /> v <br /> �r <br />