Laserfiche WebLink
Field staff must review job-specific work plan and coordinate with project manager to verify that all up front logistics are completed prior to starting work including, but not limited to permitting <br /> access agreements,and notification to required contacts(e g site managers inspectors, clients,subcontractors, etc) A tailgate safety meeting must be performed and documented at the beginning of <br /> each workda Sae Performance Self Assessment(SPSA)procedures must be used throu pout the ro ect Weather conditions(heat,cold, rain, li htnin )must also be considered <br /> r z 3 a <br /> Dispose or store any Steel toed and shank shoes,hardhat,safety Back strain Exposure to • Use proper equipment to transport water(pumps,drum dollies,etc} <br /> wastewater(if any)onsite glasses with side shields,hearing contaminants If disposing <br /> protection,reflective safety vest,and leather through onsite treatment System, • Perform air monitoring in accordance with Air Monitoring Plan <br /> gloves for the non-chemical aspects of work damage or injury from improper • <br /> as necessary If you suspect that equipment use of equipment Improper Have appropriate respirator with combination organic vapor/NEPA P-100 <br /> is contarrunated wear chenucal resistant storage or disposal cartndges within —5 feet of working location,readily available <br /> gloves Wear appropriate air-purifying • Label storage containers properly,and locate in isolated area away from traffic <br /> respirator with combination organic and other site functions <br /> vapor/HEPA P-100 cartridges as needed <br /> Wear appropriate chemical resistant suit as • Coordinate offsite disposal(where applicable) <br /> needed • Do not attempt to lift,push or move drums without the proper tools or <br /> equipment <br /> • Store wastewater in 55-gallon drums Drums will be staged in the enclosure <br /> located(Say where the driitn will be stored) <br /> • <br /> Clean siteldemabihze Steel toed and shank shoes,hardhat,safety Traffic Safety hazard left on T — • µUse buddy system as necessary to remove traffic control <br /> glasses with side shields,hearing site Lifting hazard <br /> protection,reflective safety vest,and leather • Leave site clean of refuse and debris <br /> gloves for the non-chemical aspects of work <br /> • Notify station personnel of departure <br /> as necessary <br /> • Use proper hfting techni ueq_s or use mechanical assistance <br /> Supervisor/HSC must confirm Possible injuries and damage to • Visually inspect each and every borehole — <br /> all boreholes are closed,filled property due to stepping into or <br /> in andlar capped dnving over the well <br /> SECOR International Incorporated 17 Genene HASP <br />