My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0002747
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
3500 - Local Oversight Program
>
PR0508502
>
ARCHIVED REPORTS XR0002747
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2018 9:17:06 AM
Creation date
11/6/2018 3:36:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002747
RECORD_ID
PR0508502
PE
3526
FACILITY_ID
FA0008117
FACILITY_NAME
ARCO STATION #4932
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> Attachment 8 <br /> HEALTH AND SAFETY PLAN ACKNOWLEDGMENT AND AGREEMENT FORM <br /> (All SECOR and subcontractor personnel must sign.) <br /> This Health and Safety Plan has been developed for the purpose of informing SECOR employees of the hazards they are likely to encounter on the project site, <br /> and the precautions they should take to avoid those hazards Sub-contractors and other contractors at the site must develop their own Health and Safety Plan to <br /> address the hazards faced by their own employees SECOR has provided a copy of this Plan to contractors in the interest of full disclosure of hazards of which <br /> we may be aware, and to satisfy SECOR's responsibilities under the OSHA Hazard Communication standard Similarly, contractors are required to inform <br /> SECOR of any hazards of which they are aware or that the contractor's work on site might possibly pose to SECOR employees, including (but not limited to)the <br /> Material Safety Data Sheets for chemicals the contractor may bring onsite This plan should NOT be understood by contractors to provide information on all of <br /> the hazards to which a contractor's employees may be exposed as a result of their work <br /> I further certify that I have received training and medical surveillance according to the Health and Safety Plan and the Occupational Safety and Health <br /> Administration Standard on Hazardous Waste Operations and Emergency Response (29 CFR 1910 120) <br /> All parties conducting site activities are required to coordinate their activities and practices with the project Site Health and Safety Officer Your signature below <br /> confirms that you have read and understand the hazards discussed in this Plan, and understand that sub-contractors and contractors must develop their own <br /> Health and Safety Plan for their employees You also understand you could be prohibited by the Site Health and Safety Officer or other SECOR personnel from <br /> working on this project for not c mplying with any as ect of this Health and Safety Plan <br /> Name Title Signature Company Date <br /> I <br /> SECOR International Incorporated 33 Genenc HASP 6 34-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.